Investment projects in the region "Kalmykia"

All projectsProjects map
Information on this page is not full. Sign up and get demo access to see the full version.Request demo access
ID/added
Updated
Name
Stage
Region
Sector
Investments
Ownership
Materials

The Russian company will manage a project to breed Artemia cysts (Artemia Salina, microscopic aquatic crustacean) in the Southern Federal District. At the initial stage, the investor will invest 150 million rubles in the project — these funds will be spent on environmental work and the construction of an industrial complex.

The investor plans to build another solar power plant in the Southern Federal District and increase the installed capacity of solar generation facilities in the republic to 234.1 MW.

Инвестор построит в Южном Федеральном Округе солнечную электростанцию. Общая мощность новой станции составит 60 МВт.

Инвестор построит в Южном Федеральном Округе солнечную электростанцию. Общая мощность новой станции составит 58 МВт.

The investor will build 25 wind power plants in the Southern Federal District. The cost of the investment project is 970 million rubles. Now the investor is selecting a land plot, where wind power plants with a capacity of up to 15 MW will be built in Q2 2019.

An international water port will be built in the Southern Federal Region. Chinese companies are going to invest in the project. In near future, design estimates will be prepared and construction will start. The design capacity of the port is over 20 million tons per year.

In the Southern Federal District, as part of a public-private partnership, it is planned to build an artificial ice rink.

The investor company plans to build a wind farm with an installed capacity of up to 300 MW in the Southern Federal District. At the moment, a competition has been opened for the implementation of a complex of engineering surveys for this facility. This is not the only investor project.

Work is underway in the Southern Federal District to develop the field: 21 wells have been drilled with a total area of 52,000 m. As part of the development of the field, it is planned to build head onshore structures and a pipeline system for oil and gas transport. Oil transportation through the republic in the amount of 10 million tons per year will begin in September 2015.

Preparation of design estimates for the capital construction project: “Construction of a public highway of local importance Nyntakhn-Chagorta in Tselinny district of the Republic of Kalmykia”

Construction of the Entrance from the federal highway "Access to Elista from the federal highway M-6" Caspian "from Moscow (from Kashira) via Tambov, Volgograd to Astrakhan" to the settlement of Gashun-Burgusta.

In the Southern Federal District, an investor company is building a start-up complex for a wind power station.

Development of design estimates for the capital construction object: “Construction of the building of the Republican Special Boarding House for the Elderly and Disabled” with 40 beds, at the address: Republic of Kalmykia, Tselinny district, Troitskoye village, Severnaya St., 1 ".

Russia's largest agro-industrial holding plans to build a full-cycle meat processing plant in the Southern Federal District. The investments that the company plans to invest in the project will amount to at least 10 billion rubles.

The construction of a secondary school with 275 places in the village. Malye Derbety, Maloderbetovsky district of the Republic of Kalmykia

Provision of services for the examination of work performed on the object "City Children's Clinic for 550 visits per shift in the city of Elista of the Republic of Kazakhstan"

Implementation of work on the development of working documentation for the object: "City Children's Clinic for 550 visits per shift in the city of Elista, Republic of Kalmykia"

Construction and installation work on the construction project "City Children's Clinic for 550 visits per shift in the city of Elista of the Republic of Kazakhstan"

Construction of a comprehensive school for 528 places with a swimming pool at the address: RK, Tselinny district, Troitskoye village

Famous Italian cheeses will be produced in Kalmykia. The region’s authorities met with businessmen from Veneto who are planning to build a workshop in Gorodovikovsk. As stated, the investment project will be launched after the joint venture Agro-Venice receives a registration certificate in Elista.

execution of design estimates for the object: "Preschool educational institution with 60 seats at the address: Republic of Kalmykia, Yashkul district, village of Utta"

In the Southern Federal District, a feed mill project is being prepared for implementation. The design capacity of the facility is about 10 thousand tons of poultry meat annually. It will also produce 120 thousand tons of animal feed per year. The issue of water supply is also being addressed.

Construction of a building of a preschool educational organization for 80 places on the street. Serova in the city of Elista

An investor company is constructing the first stage of a solid municipal waste landfill in the Southern Federal District. Waste will be brought to the landfill after sorting (glass, metal, paper, plastic) at a waste sorting complex. This will make it possible to process waste from all over the region.

Execution of work on the facility: "Construction of a rural highway p. Bembishevo - p. Peredovoy Gorodovikovsky district of the Republic of Kalmykia"

Construction of a catering unit with a dining room for 120 seats and a sleeping building for 120 places with sewage treatment facilities for the Sarpinsky psychoneurological boarding house in the village of Gojur, Sarpinsky district of the Republic of Kalmykia

Restoring the profile of crushed stone roads with the addition of crushed stone and soil stabilizer of the R-215 Astrakhan - Kochubey - Kizlyar - Makhachkala highway in the area of km 156 + 000- km 171 + 000, Republic of Kalmykia

In the Southern Federal District, it is planned to build a year-round complex for growing flower and vegetable crops. The total area of the greenhouse enterprise will be 30 ha. The first phase (about 6 hectares) for growing cucumbers is planned to be put into operation in 2020.

Work for the needs of OOO Gazprom Mezhregiongaz on the construction of gas distribution facilities in the Republic of Kalmykia under the Gasification Program for the Regions of the Russian Federation

Execution of work on the facility: "Construction of a highway in the village of Kirovsky - in the village of Gojur of the Sarpinsky district of the Republic of Kalmykia"

In the Southern Federal District, a slaughter and processing complex for cattle is being built. The total investment is 4.6 billion rubles. It is planned to purchase raw materials for processing both from local agricultural producers and to grow them in their own feeding complexes of the "feedlot" type.

In the Southern Federal District, the construction of a new waste recycling plant was completed. Currently, the installation of the conveyor belt is underway, as well as the planning and improvement of the adjacent territory. We are talking about the construction of access roads for special vehicles.

In the Southern Federal District, it is planned to build a small-sized unit for oil distillation. A public hearing was held on the construction of an oil refinery in the rural municipality. An important point is that the refinery will be registered in the republic, therefore, tangible tax deductions will come to the budgets of all levels.

As part of the PPP, a plant is being built in the Southern Federal District for the production of frameless reinforced concrete structures for bezelless frames in the construction of buildings. The total investment in the project is 170 million rubles.
Show by:2550100300