The investor will invest 24.1 billion rubles in the construction of a mining and processing plant for the development of a polymetal deposit. The project is planned to be implemented by 2028. The capacities of the new production will make it possible to produce 624.59 thousand tons of lead and 812.66 thousand tons of zinc concentrate per year.

In the Siberian Federal District, it is planned to implement a project to modernize and expand the processing plant. The project will be implemented in two stages.

In the Siberian Federal District, it is planned to implement a project to modernize and expand the processing plant. The project will be implemented in two stages.

In the Far Eastern Federal District, it is planned to implement a project for the reconstruction of a hotel in the historical center of one of the cities.

The investor plans to build in the Far Eastern Federal District a new dairy complex with 630 heads. The project cost is 860 million rubles.

The investor is going to implement a project to create a regional wholesale and logistics center with a workshop for processing, packaging and a warehouse for storing vegetables of open ground in the Far Eastern Federal District. Investments in the project will amount to 700 million rubles.

A coal-preparation facility will be built at a preparation plant in the Far Eastern Federal Region. The expected production capacity of the preparation facility will be 6.0 million tons of bituminous coal of ''D'' rank per year.

In the Far Eastern Federal District, an enrichment plant will be built on the territory of a gold deposit.

The president of the corporation engaged in the construction of residential and non-residential buildings, during a meeting with the acting governor, announced his intention to implement new projects in the Trans-Baikal Territory. In particular, it was about building a cement plant in the region. Its production capacity may reach 500 thousand tons. cement per year.

In the Far Eastern Federal District, it is planned to implement a construction project for a mining and processing enterprise. Investments in the project may amount to 1 billion rubles.

The investor plans to build a grinding complex for a special cement plant. Within the framework of the investment project, it is planned to build a grinding complex of a special cement plant and create production capacities (2 cement mills) for the processing of a cement mixture,

The investor company plans to implement the investment project "Creation of a pilot industrial production for the processing of lithium ores" in the Siberian Federal District. The administration of the region plans to create a territory of priority social and economic development in the area, and the investor is one of the potential residents of the new TOSED.

In the Far Eastern Federal District, the investor is developing a lead-zinc deposit. An enrichment plant has already been built at the facility, and by 2025 the company intends to build a second factory with a capacity of 2.2 million tons of ore per year.

The city signed an investment agreement on the implementation of the project. A new law company is registered under the project. Duration of the project - 2015-2021. Investments in the project will amount to about 52 billion rubles. The ore will be processed at the plant. About 250 jobs will be organized.

The Investor company will deliver a project to develop a coal deposit in the Far East Federal Region.

A gold mining company is going to build and commission a gold mill at a gold ore deposit in the Far Eastern Federal Region. The investor has already started pre-construction works.

Mosstroytrans company is delivering two coal projects in the Region - development of Ureisk coal deposit in Duldurginsky District and development of Kutinsky lignite deposit in Priargunsky District.

In the Siberian Federal District, the domestic company initiating the project plans to build a mining and processing plant. The project was developed by a foreign company. The future GOK is planned to be built at the site of development of one of the Siberian copper deposits. The terms of the Project implementation correspond to the terms established by the License for the use of subsoil. Among the planned works: the construction of infrastructure facilities (2019), the beginning of industrial production (2021). The enterprise will reach full design capacity in 2023. The resources of the deposit are more than 26 million tons of copper.

In the Far Eastern Federal District, it is planned to implement a construction project for an elevator. The capacity of the project with railway access is designed for 80 tons. ”The enterprise is planned to be implemented on a land plot on which there is already a railway line.

A large-panel house building plant will appear in the Far-Eastern Federal Region thanks to the status of territory of advanced development. The plant's production capacity will amount to 15 thousand sq.m. pf housing accommodation per year. The plant's commissioning is expected next year.

An Investor company is going to carry out reconstruction of a sulphide-polymetallic field (phase 2) to improve its performance in the Far Eastern Federal Region. Public hearings of the project are being held.

The investor intends to invest about 1 billion rubles in the modernization of a gold mine in the Far Eastern Federal District. Given that mining is carried out underground, the investment will pay off no earlier than in two years.

In the Siberian Federal District, it is planned to implement a range of work on the project for the construction and reconstruction of the airfield.

In the Far Eastern Federal District, a mining enterprise will be built at a gold ore deposit. Already in 2020, it is planned to produce 1.2 tons of gold at the new processing plant. The design capacity of the enterprise for the extraction and processing of ore deposits is 200 thousand tons per year. Total investments in the creation of a mining and processing enterprise, including the purchase of machinery and equipment, amounted to about 5.5 billion rubles. Exploration costs - 300 million rubles.

Overhaul of the bridge is planned in the Siberian Federal District. To date, construction work has begun. Customer - PKU UPRDOR region. The contract price is over 100 million rubles. According to the contract, it is necessary to complete all the work before the end of 2018.

An airport will be reconstructed in the Far Eastern Federal Region. Investments in the project amount to 2,126 billion rubles.

In the Siberian Federal District, a mining and processing plant is under construction. The planned production volumes of the plant provide for the annual extraction and processing of ore in the amount of 10 million tons and the production of 65.8 thousand tons of copper in copper concentrate, 6.9 tons of gold in concentrate, 2.1 million tons of iron in iron ore concentrate, 35 9 tons of silver in concentrate

The investor is going to implement a large agricultural project in the Far Eastern Federal District. It provides for the development of production on the territory of 60 thousand hectares until 2024. The total investment in production is estimated at 3 billion rubles.

The investor is going to start construction of a farm for 2 thousand cows in the Far Eastern Federal Region in 2020. The farm will be additionally equipped with a slaughter stand and a chilling department for meat manufacturing.

A company engaged in gold exploration and production in the Far Eastern District plans to build a processing site for gravity gold-bearing concentrates. The capacity of the installation will be 3 tons of gold-containing raw materials per day. The project provides for the construction of a gravity concentrate processing workshop, a concrete storage site for cyanidation tailings, a settling pond and two fire tanks.

Construction of a mine is planned in the Siberian Federal District. A local mining company plans to develop two fields. To this end, it was decided to build a new mine. At the end of the state examination, a competition for the selection of a general contractor

The investor, whose main activity is the extraction of ores and sand of precious metals (gold, silver and platinum group metals), plans to build a mining and processing complex in Siberia. In June of this year, according to open sources, construction work should begin. Investments in the project will amount to more than three billion rubles. The capacity of the future enterprise will be from 2.5 to 3.5 tons of gold per year.

In the Siberian Federal District, it is planned to implement a project for the construction of so-called “green energy” facilities (renewable energy sources), this work will be carried out throughout Russia, including in the Trans-Baikal Territory. These will be power plants with a capacity of more than 15 megawatts

In the Siberian Federal District, it is planned to implement a project for the construction of so-called “green energy” facilities (renewable energy sources), this work will be carried out throughout Russia, including in the Trans-Baikal Territory. These will be power plants with a capacity of more than 15 megawatts

A sulfuric acid plant will be built in the Far Eastern Federal Region.

A large rabbit farm with a capacity of 70 thousand heads will be created in the Far-Eastern Federal Region. Currently five production facilities equipped with modern automated equipment, a slaughtering workshop and selection and genetic center have already been prepared for commissioning. Three more production facilities should be built and commissioned in order to ensure plant's full capacity in 2020.

Investment company is going to build a grain transshipment terminal in the Far Eastern Federal Region.

200 million rubles will be invested in the construction of a pellet plant in the Far Eastern Federal District. A plant with a capacity of 28,000 tons of wood pellets will appear in the next few years.

In the Far Eastern Federal District, it is planned to modernize the plant for the production of construction lime. The development of the enterprise modernization program has already been completed. In the near future - the installation of a shaft furnace.

The Indian company has presented the project of a hospital construction in the Far Easter Federal Region. Currently the company's representatives negotiate project details with the regional authorities in terms of project parameters and scope of services to be provided. One of areas of cooperation is finding cancerous diseases at an early phase and their treatment. The project could be developed as public-private partnership.

In the border village of the Far Eastern Federal District, it is planned to create a universal terminal and logistics complex. The estimated volume of investments is 4 billion rubles, the expected number of new jobs is 254, and the expected commissioning period is 2022.

It is planned to create a forest terminal in the border village of the Far Eastern Federal District. The estimated volume of investments is 2 billion rubles, the expected number of new jobs is 731, and the expected commissioning period is 2020.

In the Siberian Federal District, it is planned to create a milk processing production. The first phase of the project is completed. in the near future will begin the design of the second phase of the project - a dairy farm. The total investment will amount to more than 200 million rubles.

Investor is going to build a waste and municipal solid waste recycling plant in the Far Eastern Federal Region,where inter alia, liquid hydrocarbons, bitumen, fuel oil and other products will be produced using pyrolysis method. A waste recycling plant should be built by November 2021, investments are estimated at 321 mln rub.

The 2nd phase of a gold ore plant will be built in one of ore fields in the Far Eastern Federal Region.

A cement plant based on a shaft furnace will be built in the Far Eastern Federal Region. Planned capacity - over 50 thousand tons. If this technology is used, even the plant with low capacity will be able to reduce the expenses for the prime cost. The company will produce concrete products slabs, concrete poles, dry building mixes. As of 2020, it was reported that the investor decided to change the concept and built a lime plant.

It is planned to build an industrial park in the Siberian Federal District. The park will occupy an area of more than 390 ha. 1,700 jobs will be created. The necessary investment in the project is 3 billion rubles. A way to attract investment is a public-municipal-private partnership.

The investor plans to start gold mining at one of the deposits of the Far Eastern Federal District in 2023. The project also plans to build a gold recovery factory. The design capacity of the first stage will be 2 tons of gold per year. In the future, the company plans to increase production to 4 tons of gold per year.


The Office of Rosprirodnadzor for the Trans-Baikal Territory announced the completion of a state environmental review of the project documentation “Construction of an enterprise for the extraction and processing of oxidized ores of the Delmachik gold ore deposit”. The expert commission revealed full compliance of the declared materials with the norms and requirements of the environmental legislation of the Russian Federation. Currently, active construction work is underway at the Delmachik field. The construction of transport and energy infrastructure was practically completed, a core storage facility, a hangar for heavy equipment, and social facilities (a dormitory, bath and laundry complex) were built.