In the Urals Federal District, it is planned to implement a project to expand an industrial park. The industries in which the industrial park will develop were determined.

In the Ural Federal District, the developer will build an industrial park. The territory of the industrial park is about 16 hectares, it is possible to build 80 thousand square meters on it. m of industrial buildings.

The Ural Federal District will organize the production of components for the metallurgical industry. The investor will invest 5.5 billion rubles in the project.

Investor is going to create a plant processing and recycling timber wastes with heat and energy generation. Investments amount to 309 mln rub.

In the Urals Federal District, the investor company plans to implement a project for the construction of a complex for deep processing of timber (2nd stage).

In the Ural Federal District, they will build a retail and office complex. It will appear on the lands where garages now stand, and the territory itself belongs to the PK-2 zone — production and utility facilities of the V hazard class. However, the developer, who is the owner of the site, appealed to the mayor's office in order to appropriate the territorial zone Ts-2 (public and business zone of local significance) to this site

The investor company will build a complex for the production of lifting products in an industrial park in the Urals Federal District. The main products of the investor are lifting devices, steel ropes and electrodes for welding, among the main customers are oil and gas companies.

In the Ural Federal District, the investor will build a cheese production plant with a whey drying workshop. The capacity of the plant for incoming raw materials will be 100 tons per day with the possibility of expanding to 200 tons per day. There will be two phases of construction with the possibility of alternate commissioning.

The investor is preparing for the construction of a dairy farm for 1.2 thousand heads. The project cost is about 750 million rubles.

In the Urals Federal District, the investor is going to build a new industrial workshop for the production of pre-insulated pipes.

A project of a waste sorting plant for 100 thsd. tons of waste and 100 new jobs was presented. The cost of the enterprise is 1 bln. rubles. Intermunicipal facilities for solid waste neutralization and treatment should be built by 2021. The project is still under development.

In the Ural Federal District, the plan for the construction of a regional logistics sorting postal center was revived. He will serve the county flows. The project began in 2015 and was planned to be completed by 2017. The volume of investments is about two billion rubles.

The investor intends to modernize the corrugated packaging factory in the Ural Federal District. The project provides for an increase in production volumes through the acquisition of modern production equipment.

In the Urals Federal District, it is planned to implement a project to create a new machining center. The project will be implemented on the territory of one of the special economic zones of the region.

In the Ural Federal District, it is planned to implement a project for the construction of a multifunctional complex. It is planned that a new public space will appear in the new territory.

In one of the cities of the Ural Federal District, it is planned to build a sambo palace with a total area of over 8 thousand square meters. It will be modern in terms of technical and infrastructural equipment, a building with an optimal layout of space and convenient navigation. It is assumed that the main arena with three carpets will be designed for more than 900 thousand seats, two training rooms are also provided. To date, the project has passed state expertise.

It is planned to build a touring theater in the Ural Federal District. The object will consist of a hotel building with 189 rooms, a parking lot for 86 cars, a center for exhibitions and presentations, cafes and office premises. The auditorium will consist of a stalls and three tiers of balconies. The total area of construction will be more than 22.5 thousand square meters. meters, and the height will exceed 50 meters. Capacity is 700 places.

The investor planned the restoration of the architectural monument and its adaptation as a boutique hotel. At the moment, design and estimate documentation is being developed.

About 300 million rubles is needed to modernize the site of the porcelain factory in the Ural Federal District. On the basis of the plant it plans to create "a modern craft manufactory aimed at preserving artistic creativity."

The confectionery company plans to build a logistics complex in the Ural Federal District. It will include a logistics center with an area of 10,000 "squares" and a warehouse with an area of 50,000 "squares".

Investor is developing a project of a chemicals production plant for manufacturing of non-reccurent sand molds and details used in foundry operations. This will enable to produce special cast products which are used in machine tool industry and engine manufacturing. An enterprise where the plant will be located is located in the Ural Federal Region.

In the Urals Federal District, by 2022, a large wholesale distribution center (ORC) will appear for storage, sorting and primary processing of fruits and vegetables.

An investor will open in the Ural Federal District the production of hydrophilic powders and pastes for aerated concrete. An investment project worth 370 million rubles will be launched in 2020. The project provides for the construction of a new building with an area of 1,500 square meters in the industrial park.

In the Ural Federal District, it is planned to implement a project for the modernization of a timber processing plant. Investments in the project will amount to 500 million rubles.

In the Urals Federal District, the investor company plans to implement a project to build a plant for the production of graphite electrodes.

The project initiator has not yet decided on the location of the landfill. Investments in the project have not been calculated yet. But the facility’s capacity is 250 thousand tons per year of processed raw materials.

The investor plans to build a wholesale distribution center for the storage and sale of fruits and vegetables. The framework agreement on the project to create a logistics center for the placement of agricultural products between the region and the Republic was signed at the INNOPROM-2015 exhibition. As of August 29, 2018, it became known that work is in full swing.

Work began on the construction of a new building for the workshop of an aviation enterprise. A room with an area of 11 thousand square meters was needed due to an increase in the volume of machined titanium products - discs and rings.

In the Ural Federal District, the investor company announced the creation of a unit for the production of environmentally friendly packaging, using recycled fiber as a raw material. This will be the third investor plant built in Russia.

Investor is going to build an innovative service center. The project will be located in the logistics hub. The agreement has been signed, the land plot has been defined, the Contractor and the Customer are working out the design of a future center. The Contractor is going to present the draft design of the center by end of this year, and to start works on site next year. The Contractor is responsible for design and permit documentation development and approval, carries out construction works and building's fit out works.

In the Urals Federal District, a project has begun to build a new cowshed for 198 heads of cattle. The total cost of the project is 56 million rubles.

The investor is implementing a project for the construction of a woodworking plant in the Urals Federal District. The project is planned for 2017-2026. The project involves the construction of a new veneer plant with its own logging cycle. The production has been changed to sawn timber. It is planned to create an environmental complex for the utilization and processing of woodworking waste with heat and electricity.

An investor in the Urals Federal District will modernize a proppant plant. Sleeve filters on tower spray dryers will not only ensure compliance with all environmental standards, but also create a reserve of capacity.

The bank issued a loan for the construction of a new residential complex in the Sverdlovsk region. The area of the residential complex will be 50.2 thousand square meters. The total amount of construction financing will be 4.7 billion rubles.

In the Ural Federal District, it is planned to implement a project for the reconstruction of the building of the existing engineering plant. At the moment, a contract has been concluded for the development of the project and the reconstruction of the building. Investments in the project more than 100 million rubles. Completion is planned in 2019.

In the Ural Federal District, a new plant for the manufacture of mechanical ventilation apparatus (IVL) will be built. The company will place its new production complex in the territory of the SEZ.

In the Urals Federal District, the production of electro-hydraulic actuators will be organized to control the opening and closing of valves on main gas pipelines. The project also involves the production of components. The volume of investments will amount to 244 million rubles.

In the Urals Federal District, it is planned to reconstruct the MSW processing plant, which should be completed in 2021 and will require an investment of 1 billion rubles. (in view of VAT). First, the investor company must carry out design and survey work, their cost was estimated by the government at 56.6 million rubles. Then the company will start reconstruction (680.1 million rubles) and construction and installation works (263.3 million rubles).

In the Ural Federal District, a residential complex is being built in an ecologically clean area. Currently, out of 19 houses, 15 have already been commissioned; one is in the process of construction.

The non-ferrous metal processing plant in the Ural Federal District will begin producing pigmented aluminum powder with a capacity of 1008 tons per year for. The total project budget is 200 million rubles.

The conveyor equipment plant will launch production of machine tools and equipment for metallurgy, construction material industry and mining enterprises in the Ural Federal Region. The investments amount to 233 million rubles.

A large Russian manufacturer and supplier of polymer pipelines for heating and water supply systems will launch new equipment for the production of polypropylene sewer pipes and fittings. The project cost amounted to 80.7 million rubles.

The company has received permission to build the 4th stage of a business-class residential complex in the Urals Federal District. In total, it is planned to build three buildings within this phase.

The investment company is going to build a seedlings cultivation orchard in the Ural Federal Region.

In the Ural Federal District, the investor is going to expand the production of cups for coffee, packaging for wok noodles and sushi, ice cream bowls. To implement the project, the company was allocated a land plot with an area of 5 thousand square meters and provided 60 million rubles under a program of preferential bank lending.

A railway wheels plant will be built in the Ural Federal Region. It is assumed that the project will raise the investments in the amount of 16 billion rubles. Production will start in 2022. According to the investor's plans, the plant will produce 200 thousand railway wheels per year.

A commercial-dairy farm should be built in the Ural Federal Region. Project investments may total more than 1,5 bln rub. The plant will work to the full capacity by 2022. Investor is looking into the options for creation of a cheese-making plant.

In the Urals Federal District, it is planned to implement a project for the construction of a dairy farm. Investments in the project may amount to more than 1.7 billion rubles. The enterprise will reach its full design capacity in 2022.

An investor specializing in the extraction and processing of peat is implementing an investment project worth 1.1 billion rubles. The project is designed for five years, during which time the company plans to increase the volume of peat extraction and processing from 250 thousand cubic meters per year to 1.5 million cubic meters.

A 3D printers manufacturing enterprise and a competence center on additive technologies will be created in the Ural Federal Region.