The developer company plans to build an apartment building in the city of Yakutsk. Area: 5397 sq. m. Class of housing: typical. Infrastructure: children's playgrounds, sports grounds, recreation areas equipped with modern small architectural forms are designed in the courtyard.

Yakutsk Fuel and Energy Company JSC (YATEK) signed a memorandum of intent with Japanese Mitsubishi Heavy Industries and Sojitz Corporation to consider the possibility of cooperation in the design and construction of a methanol production complex based on the company's natural gas resources, as well as in organizing financing. The complex is planned to be built on the right bank of the Lena River, near the Nizhny Bestyakh railway station.

An LNG plant is planned to be built in the Far Eastern Federal District. It may appear before 2025. The production volume of the first stage of the planned plant will be 80 thousand tons per year.

The investor starts a pilot development of a gold mine in the Far Eastern Federal Region. The design and construction of the gold mining plant are scheduled for this year. The first phase of the plant will have a capacity of 300 thousand tons of ore per year.

In the Far Eastern Federal District, they signed an Agreement on the implementation of an investment project for the construction of a 4-star hotel with an area of 7.7 thousand square meters. m and with a capacity of 150 rooms. The facility will be located on a plot of 0.15 ha. The hotel is scheduled for commissioning in 2021 and will operate under an international brand.

In the industrial park, it is planned to create a full cycle of baked clay brick production using Chinese technology. Planned capacity - 12 million units per year. During the construction of the brick factory, special attention will be paid to issues related to safety and personnel policy.

The developer company plans to build an apartment building in the city of Yakutsk. Area: 5031 sq.m. Housing class: typical. Infrastructure: children's playgrounds, sports grounds, recreation areas equipped with modern small architectural forms are designed in the courtyard (children's play complex, a rocking chair for a children's playground Pchelka, Rocking chair, a carousel, a children's play sandbox, children's swings, benches, trash cans)

The developer company plans to build an apartment building in the city of Yakutsk. Area: 9842 sq.m. Housing class: typical. Infrastructure: at the recreation area of the adult population and the playground, small architectural forms for play and utilitarian purposes are installed

Investment company will pour 16 bln rub into expansion of a liquefied natural gas plant. It is expected that the liquefied natural gas plant in the Far Eastern Federal Region will reach a production capacity of 260 thousand tons per year by the end of 2022.

The investor plans to build an enrichment plant as part of the creation of the mining and processing enterprise. Design is ongoing, which will last until August 2018. No general contractor selected. It will be necessary to determine the final amount of funding. Approximately, the construction of the GOK Construction project will require about twenty billion rubles.

A hospital will be built in the Far Eastern Federal Region, the project will cost 700 million rubles. Construction is scheduled to complete in 2020.

The project initiator company proposes for implementation an investment project that requires investments "Construction of a complex for the production of penoceolite." The total investment in the project is less than 100 million rubles. Found 8 million rubles. In January, the project initiator plans to begin designing.

In the Far Eastern Federal District, it is planned to carry out a large-scale reconstruction of the existing airport. It is planned to reconstruct the terminal building, as well as the runway. At the moment, the project is at the design stage.

An enterprise which is the only dairy processing plant in the district, has decided to build new dairy and cheese production facilities in the Far-Eastern Federal Region.

In the Far Eastern Federal District, as part of a public-private partnership, it is planned to implement a project to build a highway with a bridge.

A livestock complex for 200 places will be built in the Far Eastern Federal District. In the future, a processing shop for the production of local meat and dairy products may also be created here.

The investor intends to create a workshop for the production of finished wooden house kits. Investments in the project are not specified. Designing is underway. The local design institute is engaged in work. An investor recently received resident status. The terms of the project and its capacity are not specified.

In the Far Eastern Federal District, it is planned to implement a project to create a data center. It is planned that investment in the project will amount to 500 million rubles.

A plant for the production of high-quality ceramic tiles and porcelain stoneware from local raw materials will be built in the Far Eastern Federal District. The amount of necessary funding is 1.5 billion rubles. The total area allocated for construction is 12 hectares. The project initiator plans to produce two million square meters of granite and one million glazed ceramic tiles.

In the Far Eastern Federal District, the investor will reconstruct the tailings of the gold recovery plant. The project cost is billions of rubles, its implementation is designed for several years.

The Investor completed a number of major works as part of the repair project at the processing plant. Over 1 billion rubles are to be provided for the modernization project for this year.

In the Far Eastern Federal District, it is planned to implement a project for the construction of a new sports and recreation complex with a skating rink. The contract price for design work is more than 20 million rubles.

The private investor is going to build a year-round children leisure and health center in the Far Eastern Federal Region.

The enrichment plant in the Far Eastern Federal District is waiting for reconstruction and redevelopment taking into account climatic and geological features. In particular, the reconstruction of the main building of the factory with a rock bunker, pit of imported coal, a coal preparation building, a loading point with a railroad scale, a point for rolling coal in wagons and a magnetite warehouse is ahead. Thanks to the reconstruction, the production capacity of the factory will increase from 5 to 6 million tons of raw coal per year.

The investor plans to create a timber processing complex. The project is in the pre-project phase, there is a business plan, forest inventory has been carried out in the upper Amga area.

In the Far Eastern Federal District, it is planned to implement a project for the construction of a solid municipal waste (MSW) landfill.

6 billion rubles will be invested in the construction of power lines to the gold deposit in the Far Eastern Federal District. It is planned to begin construction in July 2020, to complete in the second quarter of 2022.

In the Far Eastern Federal District, the investor company plans to implement a project for the construction of a processing complex.

The developer company plans to build an apartment building in the city of Yakutsk. Area: 12647 sq.m. Housing class: typical. Infrastructure: the project includes: - Playground (covering the master ayber) with a sports area for children and a recreation area for adults, with small architectural forms: Geodom, Sandbox, a house with a slide "Uley", Mini climbing wall, Play complex "Swing"; - A sports area with a basketball court (covering master ayber), having small architectural forms: a step simulator (double) (2 pcs.), A trainer for the press (double) (2 pcs.), A triple horizontal bar (2 pcs.) , a double bicycle (2 pcs.), a simulator with their legs + bars (2 pcs.), a simulator with them from the chest vert. thrust (2 pcs.), basketball court.

The developer company plans to build an apartment building in the city of Yakutsk. Area: 6608 sq.m. Housing class: typical. Infrastructure: the project provides for the construction of a children's playground - 466.35 sq.m., places for recreation of the adult population - 40.00 sq.m.

The developer company plans to build an apartment building in the city of Yakutsk. Area: 7478 sq.m. Housing class: typical. Infrastructure: the project provides for the construction of a children's playground - 466.35 sq.m., places for recreation of the adult population - 40.00 sq.m.

The developer company plans to build an apartment building in the city of Yakutsk. Area: 10126 sq.m. Housing class: typical. Infrastructure: the project provides for the construction of a children's playground - 261.25 sq.m., places for recreation for the adult population - 32.00 sq.m.

A feasibility study for construction of a 250 km long overhead power transmission line is being reviewed in Yakutia with the support of the Far East Development Fund.

In the Far East, the construction of the first stage of a thermal power plant is underway. Today, the installation of the frame of the combined building of the station under construction has completed. Builders began to install wall panels. The total cost of the project will be about seventeen billion rubles. It is planned to complete the work on the project in the 4th quarter of 2015.

In the Far Eastern Federal District, an investor will spend almost 740 million rubles on the construction of a prospecting well in a gas condensate field. The contractor should begin work in October 2020. It is necessary to complete the construction of the facility by September 2021.

In the Far Eastern Federal District, it is planned to implement an investment project to expand the production of lumber. The estimated investment amount is more than 1 billion rubles. It is designed for the procurement of commercial wood with a volume of more than 200 thousand m3 and the production of more than 100 thousand m3 of sawn timber.

In the Far Eastern Federal District, the administration of one of the regions plans to implement a project to create an agro-industrial cluster.

A project for the construction of a mine at 4 million tons per year is planned in the Far Eastern Federal District. The project is undergoing public hearings.

In the Far Eastern Federal District, the investor company plans to implement a project for the construction of a greenhouse complex (2-3 phases).

In the Far Eastern Federal District, it is planned to build a garbage transfer station and a new landfill. The project assumes that the necessary modern infrastructure will be organized in the region. The construction will be carried out entirely at the expense of the investor, the amount of funds will be more than 1 billion rubles, the project is implemented on a concession basis.

In the Far Eastern Federal District, it is planned to build a garbage transfer station and a new landfill. The project assumes that the necessary modern infrastructure will be organized in the region. The construction will be carried out entirely at the expense of the investor, the amount of funds will be more than 1 billion rubles, the project is implemented on a concession basis.

The Investor is executing a project to build the infrastructure of a coal plant in the Far Eastern Federal Region. A memorandum was signed with the development corporation on financing the infrastructure of the coal plant. Infrastructure facilities will include about 7 km of the railway line from the station to the concentration plant and 7.5 km of a 110 kV high-voltage power line with a substation.

Investor will build a fish-processing plant in the Far Eastern Federal District of Russia. The project sponsors are going to invest about 100 mln rub in the project. Full-scale project of building a fish-processing plant includes a launch of a new enterprise, a new local brand and landscaping of the territory itself.

A project for construction of an liquefied natural gas plant will be carried out in the Far Eastern Federal Region. The investor is going to build the third phase of the project with a capacity of 500,000 tons per year.

The investor plans to build a plant for the production of building metal structures. The production will use steel operated at low temperatures. The future capacity of the enterprise is 500 tons per month. The project initiator has many years of experience in the construction industry and a wide network of partnerships, which will allow to sell products for which demand is consistently high, through established channels

Investor is planning reconstruction of the airport. About two billion rubles will be invested in the project. Dates of work - 2019 - 2022. According to the project, the length of the new lane will be 1772 * 36, in addition to this it is planned: two new treatment facilities, a new fuel and lubricant warehouse, ACC, a checkpoint blocked with guard rooms, a modular boiler room, a new fence and a patrol road.

In the Far Eastern Federal District, it is planned to build a garbage transfer station and a new landfill. The project assumes that the necessary modern infrastructure will be organized in the region. Construction will be carried out entirely at the expense of the investor, the amount of funds will be more than 1 billion rubles, the project is implemented on a concession basis.

In the Far Eastern Federal District, as part of a public-private partnership, it is planned to build a cultural center.

The investor intends to begin work on the construction of a mining enterprise and the extraction of coking coal in the Far Eastern Federal District. According to the license, the planned volume of coal production should be 500 thousand tons.

The investor plans to build a ceramic brick factory. Investments in the project will amount to more than one billion rubles. The company will reach full capacity in 2023. The new enterprise will create about a hundred jobs. The launch of auxiliary production will provide work for another 200 workers. The plant’s productivity will be 30 million bricks per year. The raw materials will be loamy deposits in the ulus.