Projects by subject "reconstruction of a metallurgic plant"

All projectsProjects map
Information on this page is not full. Sign up and get demo access to see the full version.Request demo access
ID/addedID/added
UpdatedUpdated
NameName
StageStage
RegionRegion
SectorSector
InvestmentsInvestments
OwnershipOwnership
Materials

The construction of a solid waste landfill is underway in the Ural Federal District. The project envisages that the landfill will house five thermal waste disposal units operating on gas in an automatic mode.

The organic fertilizer manufacturer plans to create a logistics complex in the Central Federal District, which will almost quadruple the volume of production. The size of investments in a new project can range from 350 to 400 million rubles.

In the Volga Federal District, the investor company plans to implement a project for the construction of a livestock complex.

The developer of industrial facilities has begun construction of the first building of the industrial park in the Central Federal District. Its area will be 40,000 square meters. m.

In the Ural Federal District, the developer will build an industrial park. The territory of the industrial park is about 16 hectares, it is possible to build 80 thousand square meters on it. m of industrial buildings.

A smelting section of a metallurgical plant will be built in the Central Federal District. The capacity of the projected section will be 8,400 tons of metal products per year.

In the Central Federal District, the investor plans to build a plant for the production of snack products. To implement the project, the company needs a land plot with a total area of about 2 hectares.

In the Central Federal District, an investor can build a production of cutting and grinding abrasive wheels with a capacity of 5 million pieces per year in the next two years. The investment is estimated at RUB 574 million.

A warehouse with an area of 40 thousand square meters will be built in the Central Federal District. m. Work on the construction of an industrial building has already begun. Its working height will be 13 m. According to the project, the facility will provide for the possibility of cross-docking operations.

A large retailer decided to invest 2.5 billion rubles in launching a project in the Ural Federal District. The investor plans to launch the logistics complex in 2021.

Five covered warehouses with all the necessary infrastructure for storing soybeans, wheat and corn will be built in the Far Eastern Federal District by an investor. The commissioning of the facility is scheduled for the 4th quarter of 2024.

The shipyard in the North-West Federal District has announced a tender for the search for a contractor who will perform construction and installation work in the block of hull shops of metal shipbuilding. The starting price of the contract is RUB 490.21 million.

The Investor is going to build the second building in the Central Federal Region to install a sandwich panel production line there. Construction is scheduled to complete in 2021.

An Investor is delivering a construction project of an equestrian center in the Southern Federal Region. 100 million rubles will be invested in the project.

The investor company is going to upgrade dairy production lines in the Volga Federal Region. Over 300 million rubles will be invested in modernization.

A plant for processing kilka, sprats and hamsa will be launched in the Southern Federal District. The project involves three stages. The second and third stage - the production of animal feed and fish oil.

The investor is modernizing the winemaking center in the Southern Federal District. The modernization is carried out as part of the company's course to meet the needs of a wide range of consumers and create multifaceted wines.

The wine holding is investing in the construction of an enology center in the Southern Federal District. At the Center, guests can get acquainted with the main stages of grape processing, see the processes of wine preparation, as well as visit a gastronomic restaurant and an authentic mini-park with an educational platform.

The Ural Federal District will organize the production of components for the metallurgical industry. The investor will invest 5.5 billion rubles in the project.

In the Southern Federal District, it is planned to implement a project for the construction of a fish farm. The project is currently under development.

The investor will build his third garment factory in the Southern Federal District. The company expects to complete the construction of a factory worth 250-300 million rubles excluding equipment in about 3 years. The building area is about 4 thousand square meters. meters, the planned annual capacity is 200 thousand units. sewing products of the upper assortment.

Investor is going to create a plant processing and recycling timber wastes with heat and energy generation. Investments amount to 309 mln rub.

Seed production and crop products warehouse facilities will be built in Siberia Federal Region. It is expected that investor will pour 387,56 mln rub into the project.

A metal structures plant may be built as a part of public-private partnership in the Central Federal Region.

A comprehensive inter-municipal solid waste landfill worth 2.9 billion rubles will be built in the Ural Federal District by 2024 on a concession basis. The landfill capacity will be 180 thousand tons per year.

A complex for the production of methanol, ammonia and fertilizers will be built in an industrial park in the Central Federal District. The investor is ready to build and launch the complex within 4 years.

The investor is going to implement an investment project for the construction of a dairy farm at a former dairy factory. The farm will be designed to produce 30 thousand tons of milk per year. The investor requested support in obtaining a soft loan of 150 million rubles. These funds are needed for the purchase of raw milk and the launch of the enterprise.

The investment company is going to build an export-oriented selection center in the Southern Federal Region.

Investor is going to launch a plant producing protein-vitamin concentrate from carbohydrates in the Central Federal Region. The plant will adopt the technology in production of compound feeds for agricultural animals, poultry and fish. Investments will amount to 150 mln rub.

The Investor will build a plant manufacturing soundproof, heat- and fire insulation boards in the North Caucasian Federal Region. As reported, the plant will have a capacity of 80 thsd. tons of mineral rock wool and up to 1,500 sq. m. of laminated panels.

The Investor specializing in containers, is going to invest 193 mln. rubles in construction of a terminal and create 25 jobs.

The investor will launch the production of chalk fillers and polymer masterbatches with a capacity of 100 thousand tons per year in the industrial park in the Central Federal Region. The project budget totals 999.7 million rubles.

Construction of a shipbuilding plant started in the Northwestern Federal Region. Construction of the facility will be executed in two phases until 2020.

An investment company is going to build a modern plant of lighting fixtures and their components in the Volga Federal Region in order to implement energy efficient systems in urban and rural settlements.

A Russian investor is going to build an LED lighting systems plant in the Volga Federal Region in partnership with the leading South-Korean companies in the sector of LED technologies. At the 1st phase the components will be partially manufactured abroad, however, it is supposed that later most of the components will be produced in the Special economic zone. On the whole, the project is expected to complete by late 2021. Total volume of investments will reach 300 mln rub, roughly 150 jobs will be created.

A perfume and cosmetics plant will be opened in the Central Federal Region. Target investments volume amounts to roughly 467 mln rub. Roughly 280 jobs will be created. The plant will be aimed at producing wet wipes, wet toilet paper and rolled towels for private brands (basically for large-scale retailers of Russia).

An investment company is looking into the options of creating a curd cheese factory in the North-West. An economic model is being calculated now, market research is being carried out, necessary amount of equipment estimated. The company is going to produce 6 thsd. tons of cheese per year. According to experts' estimates, investments in such a factory can make up to 300 mln. rubles.

A sea reatreat center will be built in the Southern Federal Region. It will incclude a pier for yachts, motor vessels and boats, administrative and public complex consisting of 60 villas and tourist activities areas and a car park. Project investments total 750 mln rub.

The construction of a plant for reinforced concrete products in the Volga Federal District should be completed this year. According to the plans, the company will produce hollow core slabs, large-panel slabs, partitions and piles, the plant's capacity is 60 thousand square meters of reinforced concrete products per year, investments - 800 million rubles.

In the Central Federal District, it is planned to implement a project for the construction of a livestock complex. At the moment, the design basis for all these complexes is being worked out. The investor is ready to cooperate directly with the executors, and it is desirable that these are large companies that have positive experience in this field.

A major manufacturer of souvenirs in the North-West is going to invest 1.5 billion rubles in construction of a modern warehouse facility. The facility will have an area of ​​38,000 square meters and it will consist of a dry class A + warehouse and a three-story office area.

In the Central Federal District, it is planned to implement a project to build a center for servicing agricultural machinery. estimated investments in the project will amount to more than 200 million rubles. The investor has already carried out the removal of utility networks for the subsequent construction of the building.

A new workshop of a garment factory will be created in the Central Federal Region. Project investments will reach approximately 300 mln rub. As of today, the company is one of Russia's largest manufacturers and suppliers of uniforms, personal protection equipment and PVC articles. New wearing apparel workshop will occupy an area of approximately 5 thousand sq.m.

An investor in the Far Eastern Federal District plans to build a mega farm for 2400 cows as part of an increase in milk production - the project cost is over 1200 million rubles.

In the Ural Federal District, it is planned to implement a project to create a new plant for the production of fiber cement boards. The plant is planned to be built on a large regional limestone deposit. The project is implemented with the support of the regional Investment Development Agency. The investor is a large foreign holding. The project is currently under development.

In the Urals Federal District, it is planned to implement a project to create a new kaolin enrichment plant. The plant is planned to be built on a large regional limestone deposit. The project is implemented with the support of the regional Investment Development Agency. The investor is a large foreign holding. The project is currently under development.

The investor plans the construction of a fish processing complex. As of April 2, 2019, it became known that pre-design studies are underway, the lands have been given the appropriate status. The design company will be led by Chinese partners. In Russia, an investor can resort to the services of a project company only in the matter of adapting the project.

The investing company will launch the production of polysaccharide ethers for the needs of the oil industry and other sectors of the economy in the territory of the special economic zone in the Siberian Federal District. The project provides for the production of high-quality grades of cellulose ethers and solves the problem of import substitution of reagents for drilling fluids.

The investor company is completing a project to build a plant for processing electronic scrap concentrate for the extraction of non-ferrous and precious metals. It is planned to place the enterprise on the territory of advanced development in the Central Federal District. The amount of investment in the project was not disclosed.

In the Central Federal District, it is planned to implement a project for the construction of a flour mill in the territory of one of the settlements in the region. The investor also plans to implement a project for the construction of a livestock complex at the first stage of the project. Total investments in both projects will amount to more than 10 billion rubles.
Tell us whether you accept cookies

We use cookies to collect information about how you use Investportal.info. We use this information to make the website work as well as possible.