In 2024, the investor plans to launch a smolt plant in the North-Western Federal District for 3.2 billion rubles. The declared capacity of the plant is up to 7 million fish of salmon and trout stock.

Reconstruction of the GOK is planned in the Northwestern Federal District. Basically, the reconstruction of a crushing plant and an enrichment complex involves technical re-equipment, but within the framework of the investment project it is also planned to build new individual objects and structures.

In the Northwestern Federal District, it is planned to implement a project to build a support base for coastal support for shelf projects.

In the Northwestern Federal District, the investor company plans to implement a project to build a coal transshipment complex.

In the North-West Federal District, the investor is going to create a production of abrasive materials. The company plans to start building a new production facility this year. It should be earned in 2021.

The investor plans to invest in the construction of a factory for the production of 3D panels for construction in TOSED in the north-west of Russia. The volume of investments will be 95 million rubles, 20 jobs will be created.

The investor will build another fish processing plant in the northwest. The construction of a plant with a capacity of 25 tons of finished fish products per day will begin at the end of August 2019. After the start of production, the company will receive quotas for the catch of cod and haddock - about 1 thousand tons per year.

In the Northwestern Federal District, a plant for the production of semi-decks (subdecks) and pipeline nodes for LNG projects is under construction.

In one of the cities of the North-West Federal District, it is planned to build an airport complex. The investor introduced the concept of the development of the air harbor until 2025. In accordance with it, he sets the task of building a new airport terminal in 2017-2019. The preliminary cost of the project is more than 900 million rubles.

Russian Salmon CJSC (part of the Baltic Coast Group of Companies) intends in 2014 to begin construction of a plant for the production of salmon smolt (fry) in the Murmansk Region. It is assumed that the plant will be built on a 12-hectare site in the vicinity of Malaya Volokova Bay (Murmansk Region), and will be commissioned in 2016. The capacity of the first stage of the plant will be 10 million tons of smolt, the construction of the second stage will expand the capacity to 20 million tons The volume of investment in the project depends on the equipment used, the readiness of the transport infrastructure, the total capacity, and so on, but, according to experts, the amount will exceed 1-1.5 billion rubles.

On the basis of the shipyard in the North-West Federal District, a maritime complex will be created. The complex will provide berths for mooring fishing vessels, as well as receive and store fish. The volume of investments in the project will be about 2.3 billion rubles.

The capital city investor is going to built an ice rink in Murmansk region. The works have already started, commissioning is scheduled for May 2020.

In the North-West Federal District, it is planned to implement a project to build an additional line for the production of pasteurized milk and dairy products in the near future.

The investor plans to invest in the opening of a workshop for the repair and maintenance of mining equipment in TOSED in northwestern Russia. The investment will amount to 100 million rubles, 32 jobs will be created.

In the North-West Federal District, the investor will build two plants for processing cod, haddock and other fish species each with a capacity of at least 8 tons of finished products per day. The volume of investments under the project is estimated at 192 million rubles.

The company is going to invest in construction of a fish processing plant in the North-Western Federal Region. The Investor is ready to provide 1 billion rubles for the project, while the project is only viable if investment quotas for fishing are provided as a state support measure.

In the Northwestern Federal District, it is planned to build a shipyard for the production of large-capacity Arctic platforms and technological modules used for the construction of floating plants in the Arctic. Investments for the full development of the project - about 25 billion rubles.

In the Northwestern Federal District, construction and reconstruction of the production and technological complex is planned.

In the NWFD, it is planned to reconstruct a branch of a shipbuilding plant. Reconstruction and technical re-equipment will concern 2-chamber dry dock. The design company is a subsidiary of the project initiator.

Renovation of the residential quarter will start in the North-Western Federal Region. According to the project of comprehensive development of a district, 200 thousand square meters of residential areas will be built in the city to accommodate 4 thousand families.

The start of the construction of a marine terminal in the North-West Federal District is expected in the III quarter of 2021, completion - by mid-2024. Under the project, it is planned to create a container terminal with a capacity of 500 thousand TEUs per year, designed for transit freight traffic, as well as a terminal for transshipment of supplies with a capacity of up to 1 million tons per year.

Until 2021, a wind park will be commissioned in the North-Western Federal District, with an installed capacity of 201 megawatts. During the implementation of the project, turbines will be used from Siemens Gamesa. After implementation, it is expected to reduce carbon dioxide emissions by 240 thousand tons.

The investing company selects a land plot in the North-West Federal District for the construction of the terminal. The company claims a transshipment capacity of five million containers per year. According to the general director of the company, the final selection of the site will occur no later than December 2019, the terminal itself should appear in 2024. The estimated investment in its construction will be approximately 60 billion rubles.

A specialized bulk cargo terminal will be built in the North-West Federal District. The annual capacity of the terminal will exceed 4 million tons of mineral fertilizers. The design of the facility is scheduled to begin this summer, and put into operation in 2023.

In the North-West Federal District, it is planned to implement the construction of a factory for the extraction and processing of mica phlogopite from industrial waste from a regional deposit. The factory project is included in the state program for the revival of single-industry towns. Investments in the project amount to more than 500 million rubles.

In the Northwestern Federal District, the investor company plans to reconstruct the system for the management of accumulated radioactive waste (4th stage).

In the Northwestern Federal District, the investor company plans to build a terminal for transshipment of mineral fertilizers.

In the Northwestern Federal District, it is planned to create a specialized complex for transshipment of bunker fuel. The general designer completed the design work. The price of the contract for the design and survey work on the facility amounted to over 20 million rubles.

In the Northwestern Federal District, it is planned to implement a project for the reconstruction of distribution substation.

An investment company is going to build a service center in the North-Western Federal Region of Russia. Negotiations to allot a land plot are in progress.

In the Northwestern Federal District, the investor company plans to implement a project to modernize the nuclear power unit.

The Industrial Development Fund supported financially the investor in the implementation of the project to create a full-cycle aquabiotechnological complex. Borrowed funds in the amount of 300 million rubles were allocated. The terms of the project are not indicated, as well as the total amount of investments in the project. The volume of fish products will be 50 thousand tons per year.

In the Northwestern Federal District, the construction of a fitness center is planned.

An eco-technopark will be built in the Northwest in the next three years. It is planned that the amount of investments will exceed 750 mln. rubles. The new eco-technopark will include a waste-sorting facility and three garbage transshipment stations. A concession agreement on the project execution will be signed between the investor company and the regional authorities.

An investment project for the construction of an LNG terminal will be implemented in the North-West Federal District. The terminal should include two floating gas storage facilities, an auxiliary berth and onshore infrastructure. Under the project, over 70 billion rubles will be spent. It is planned to complete all the work in 2023.

A Positron Emission Tomography Center will be built in one of the cities of the North-West Federal Region. For the first time, they are going to build a PET center by raising the investments. Now a territory for future center is being selected, project's parameters, as well as the next steps are being discussed.

In the North-West Federal District, it was decided to work out a project for the construction of a fish processing complex. This will provide an opportunity for fishermen to sell the catch and at the same time preserve plots after 2021.

In the port of the North-West Federal District, the construction of a new facility, an open storage warehouse for inventory items, has been completed. The total construction area was 4,000 square meters. meters, and the warehouse itself occupies about 1,700 square meters. meters.

A fishing company has begun construction of a fish processing plant in the Northwestern Federal District; it is planned to bring the plant equipped with the most modern technological equipment to its design capacity in the fall of 2019. The production is designed to produce high-quality fish products from our own raw materials - headless gutted cod and haddock.

In the Northwestern Federal District, the investor company plans to create a tourism cluster by analogy with Rosa Khutor.

A production cluster is planned in the Northwestern Federal District. The project has been given priority status. The aim of the project is the creation of a modern, environmentally friendly production of products from wild tundra and sea salt. Investments in the project will amount to almost 187 million rubles.

In the North-West, it is planned to carry out reconstruction of the accumulated radioactive waste management system (phase 3): Reconstruction of the LRW collection system and the decontamination site at the floating control and dosimetry point PKDP-6. The customer is one of the enterprises in the region. The initial contract price is over 100 million rubles.

A new multidisciplinary ship repair enterprise will appear in the North-West Federal District - the shipbuilding center. It will include several local factories. The volume of investment in the project is estimated at 20 billion rubles.

In the North-West Federal District, reconstruction of the airdrome is planned. At the moment, the initiator of the project has announced a competition for design and survey work on the 3rd stage of the facility. The amount of the competition is more than 80 million rubles.

In the North-West Federal District, it is planned to implement a project for the construction of a fish processing plant. The plant will be equipped with modern high-tech equipment for the production of fillet and minced cod and haddock. Total investment in construction will amount to about 700 million rubles, and the capacity of the enterprise will be 50 tons of finished products per day.

In the Northwestern Federal District, it is planned to implement a project for the construction of a fish processing plant. The plant will be equipped with modern high-tech equipment for the production of fillet and minced cod and haddock. Total investment in construction will amount to about 650-700 million rubles

The investor company plans to create an enterprise for the production of machinery and equipment for emergency response to oil spills in the Northwestern Federal District. By 2025, the enterprise plans to achieve a localization level of equipment production of at least 70%.

Transnational corporation, the world's largest producer of explosives with operations in more than 50 countries. plans to create a production of cartridge emulsion explosives in the territory of the existing plant to supply them to a large company engaged in the production of phosphate raw materials.

It is planned to build a hotel in the Northwest. The first phase is planned to be commissioned before the end of 2017. One of the recreation centers in the region will also be modernized. After modernization, the capacity of the base should be increased from 40 to 80 people. The total investment price is over 100 million rubles.

In the North-West, the reconstruction of the marine station building was completed. The contract price is over 300 million rubles. The project provided for the strengthening of building structures. During the reconstruction of the facility, a number of measures were also taken to increase the seismic resistance of the building: the exclusion of existing pile foundations from the work and the unified monolithic slab on a natural base under the entire building, the creation of an anti-seismic seam, the strengthening of the existing masonry walls, the strengthening of columns and other building structures, and the installation of anti-seismic belts. etc.