The Central Federal District plans to build a car base. The facility will be located on a 2.8 ha land plot. The project provides for the construction of a car park with an area of 7, 4 thousand square meters. It will include a production building, workshops, a paint shop with a car wash area, as well as other premises for industrial and administrative purposes.

An investment company is going to build a business center in the Central Federal Region. Investments amount to 4 bln rub.

A company specializing in the processing of fruits and vegetables will invest 350 million rubles in the creation of production in the Central Federal District. The construction of the enterprise is scheduled to begin in 2020, commissioning is scheduled for 2022. It will produce snacks, jams, and special cellular (cellular) water. The enterprise’s capacities are designed to produce 25 million units of products per year, which will cover an area of 10.2 thousand square meters. m

In 2019, the construction of the Rudnevo industrial park may begin. Pre-design work is completed, the design of this facility is scheduled for next year. According to the plan, the project consists of 3 phases, the last of which the investor intends to complete in 2021-2022.

An investor can build a new residential complex in the Central Federal District. It will be a complex of modern apartments with a total area of 160 thousand square meters. m. A project of 11.2 hectares is provided for the project. Investments in the complex may amount to about 13.4 billion rubles.

In the Central Federal District, it is planned to implement a project to reconstruct the telegraph building into a multifunctional complex.

In the Central Federal District, the investor company plans to implement a project for the construction of a retail and office complex.

A large-unit assembly plant for forklifts will be built on the territory of the special economic zone. It is also specified that the buildings will occupy half of the projected territory - in the remaining area they will lay access roads, make parking, plant a lawn and plants. It will require the design, construction and purchase of production equipment.

The investor plans to build centers for nuclear medicine and drug anticancer therapy. Investments and terms of the project are not specified.

In the Central Federal District, the investor company plans to implement a project for the construction of the second stage of a multifunctional complex.

In the Central Federal District, it is planned to build a production and laboratory complex for additive and foundry technologies.

The bank provided a loan of 50 million rubles to a company that specializes in the creation of unmanned aerial vehicles. At the expense of the funds received, the investor plans to reach the level of 3,000 drones per year in 2020.

In Moscow, it is planned to carry out reconstruction of the television center. According to experts, the reconstruction of the television center is an extremely expensive project in terms of investments. Its value may be more than $ 800 million. In 2015, the SLC of Moscow approved a draft urban development plan for a land plot for the reconstruction of the television center building. The project provides for the construction of a new administrative building with an area of over 90 thousand square meters and a height of more than 7 floors

It is planned to build an ice palace on the site of the old palace. The Ice Palace is currently being designed and built. They plan to open it by 2019. The purchases go through the state portal. The project is being implemented as part of the reconstruction of the Olympic complex. http://zakupki.gov.ru/epz/contractfz223/quicksearch/search_eis.html?searchString=67.05.612781.00.0010000&statuses= this competition has been canceledno info about the contractor ganina was not there

In the Central Federal District, the investor company plans to implement a project for the construction of a residential complex.

In the Central Federal District, the investor company plans to implement a project for the construction of a preschool educational institution.

In the Central Federal District, the investor company plans to implement a project for the construction of a secondary school.

In the central federal district, the investor plans to reconstruct the stadium. New sports grounds will be built on the leased land.

In the Central Federal District, the investor company plans to implement a project for the construction of a hotel complex.

In the Central Federal District, the investor company plans to implement a project to build an exhibition and business center.

An ice palace will be built in the territory of innovative center in the Central Federal Region. It is expected that construction works will start in February 2020. The palace will be located on the area of 30 thousand sq.m. and it will be able to accommodate up to 4 thousand spectators. A private investment company acts as the Project investor.

The Investor company is going to deliver a project for construction of a mixed-use center in the Central Federal Region.

The group of companies plans to build two multi-apartment residential buildings. The houses are in a place with excellent transport accessibility, near the metro. The complex has a kindergarten.

In the Central Federal District, a planning project for the territory of two microdistricts has been approved for the implementation of the housing fund renovation program. The projected area has a total area of 57 hectares.

In the Central Federal District, a territorial planning project has been approved. After the implementation of the project, the total living area will increase 3.3 times and amount to 191 thousand square meters. meters. There will be 971 more apartments in the quarter.

The research and production enterprise plans to expand production in the Central Federal District for serial production of linear electron accelerators and components for them. The project cost is more than 400 million rubles.

In the Central Federal District, it is planned to implement a project for the reconstruction of a shopping and entertainment center (SEC).

In the Central Federal District, it is planned to build a business-class apartment complex. At the construction site, the work of the "zero cycle". All communications regarding all matters regarding the construction of the facility are carried out through the NDV-Real Estate sales department.

Project for the construction of a plant for the production of automotive components. For this, a Russian-Japanese company will be provided with a three-hectare land plot. The corresponding decision was made by the Urban Planning and Land Commission under the leadership of Sergei Sobyanin.

A pharmaceutical holding is going to build a new plant in the Central Federal Region. An investment agreement has been signed. The investments into the project reach 1.9 bln. rubles. The plant will produce medicines for treatment of diseases of the digestive tract, metabolic disorders, cardiovascular, musculoskeletal, nervous and respiratory systems.

The resident of the Special Economic Zone has completed the actual construction work of its own production building in the Central Federal District.

A project for the redevelopment of the automatic telephone center building into a leisure center will be launched in the Central Federal Region. The project is under development.

In the Central Federal District, the investor company plans to implement a hotel complex reconstruction project.

In the Central Federal District in the IV quarter. In 2019, a land plot of 0.5 hectares will be put up for auction. The plot is intended for the construction of a fitness center.

In the north-west of Moscow, in the Mitino district, a large shopping and entertainment center (SEC) with an ice arena and a cinema will be built. The center will include shops of various formats, cafes, restaurants, a food court, a hypermarket, a fitness center, as well as a two-level underground parking and parking for a total of 1,019 cars.

The developer bought a plot of about 0.7 hectares in the Central Federal District for 400 million rubles. The total area of the future complex will be approximately 32,000 square meters. m of housing.

A multi-purpose center with sports infrastructure will be built in the Central Federal Region. Construction will be carried out in 2 phases. A sports and retail center with an aquazone will be built as the first phase of the project. Retail center will have an area of more than 7 thousand sq.m. Residential properties will be built as the 2nd phase. Works are expected to complete in 2-3 years.

Public and social spaces for children, creativity and development will appear in the reconstructed buildings of an architectural ensemble of the 19th century in the Central Federal Region. A major Russian developer is planning to invest in the reconstruction.

The largest company for the production of trucks, special equipment and buses is organizing the assembly production of electric buses in the Central Federal District. The design capacity of the enterprise will be at least 500 cars per year. The release of electrical components for them will also be arranged. Investments in the project are estimated at 1 billion rubles.

The construction of an office center is planned in the Central Federal District. The total area of the center will be 131,500 square meters. m. The developer focused on the organization of workspaces for the center’s employees with the maximum use of natural light and access to fresh air.

Reconstruction of the pool in one of the cities of the Central Federal District. It is planned to complete the work in 2017. According to the project, the reconstructed pool will become the first multifunctional swimming center in Russia, which can accommodate up to 10 thousand people a day. The area of the building will almost double to 42 thousand square meters. The appearance of the pool as a whole is planned to be maintained. In particular, the bas-relief and colonnade will be restored. A fountain will be built on the square in front of the pool, lawns will be planted, new benches, lanterns and urns will be put up. It is assumed that after the reconstruction the pool will cease to be open, but a sliding roof may appear above it.

In the Central Federal District, the investor company plans to build an industrial park. It is planned to erect 13 buildings, a helipad, underground and ground parking. The surrounding area will also be ennobled.

It is planned to implement a large-scale investment project in the Central Federal District. On a land plot of 0.27 hectares there will be an industrial complex for the manufacture of medical orthopedic products. It is planned to complete the construction of the complex by 2026.

A hotel complex is planned to be built in the Central Federal District. The development company bought the land for construction. The company plans to build two buildings with an area of 27 thousand square meters. meters. The first will be a luxury hotel, the second - luxury apartments.

The company, which is engaged in rent and management of its own or leased non-residential real estate, is going to build an office and laboratory building with underground parking on the territory of a technopark. The town-planning concept of the office and laboratory building location has been developed.

The investor is going to invest several billion rubles in the creation of a new production facility manufacturing monolithic integrated circuits in the Central Federal Region. More than 5 billion rubles will be invested in new buildings and equipment. It is planned to launch trial production at the new plant in 2020.

The Investor is set to implement a project on construction of plant for 6G network components.

A 51 578 sq.m. shopping mall will be built in one of the cities of the Central Federal Region. A grocery supermarket, fitness centre, food court and family entertainment centre will be opened in the mall. A shopping mall construction will be started on September 1, 2019.

A project for the construction of a multifunctional production and warehouse complex is being implemented in the Central Federal District. The complex is a distribution warehouse and is intended for the reception, warehousing, storage and dispensing of goods, including food, household goods, small household appliances, electronics and more. The construction of the facility will be carried out in five stages.

The authorities of the region provided three sites for the construction of the food complex. Three land plots with a total area of 2.2 hectares are adjacent. They are provided to the investor for the design and construction of the production complex. The complex will be designed for the production and storage of diabetic, dietary and fortified foods for children and adults.
Tell us whether you accept cookies

We use cookies to collect information about how you use Investportal.info. We use this information to make the website work as well as possible.