Investment projects in the region "Lipetsk region"

ProjectsProjects map
Information on this page is not full. Sign up and get demo access to see the full version. Request demo access
ID/addedID/added
UpdatedUpdated
NameName
StageStage
RegionRegion
SectorSector
InvestmentsInvestments
OwnershipOwnership
Materials

The Investor will build an elevator in the Central Federal Region. The capacity of the elevator will be 250 thousand cubic meters of one-time storage of plant raw materials. The project also includes the following expansion of production capacity to 330 thousand cubic meters. The new plant is scheduled to launch in the first quarter of 2021.

In the Central Federal District, it is planned to build a greenhouse complex with a total production area of over 33 hectares. The implementation of the project in accordance with the business plan will take place in three stages: 2017-2018, 2019-2022 and 2023-2025. The declared investment volume is more than 7 billion rubles.

In central Russia, works are resumed on the areas of the former starch plant. In 2015 it was planned to start construction of an industrial park with the area of 14 hectares. At present, the project concept has been changed. Having abandoned the idea of an industrial park, the Investor decided to reconstruct the starch plant.

The investor plans the construction of a production and warehouse complex. The facility will be built on the territory of the SEZ. The total investment will amount to 5 billion rubles. The enterprise will be built in three stages and put into operation in 2020. It is specified that 200 jobs will be created.

In Central Russia, the process of creating the production of food and medical inulin is ongoing. A factory will be built for production. More than two billion rubles will be invested in the project. processing capacity at the plant is 40 thousand tons of Jerusalem artichoke per year.

One of the world leaders in the production of plant protection products received the status of a resident of a special economic zone in the Central Federal District. At this site, the investor intends to build a plant that will supply products to protect grain, corn and sugar beets.

In the Central Federal District, it is planned to implement a project to build a plant for the deep processing of high protein oilseeds with a capacity of 2 thousand tons per day. The investor is a large Russian agricultural holding.

A large soybean isolates plant will be built in the Central Federal Region. The estimated investment volume is 6 billion rubles.

It is planned to build a data center for 2 billion rubles. in a special economic zone. The company already registered in the economy zone plans to invest more than 2 billion rubles. in the development and implementation of innovative software products and software and hardware systems for working with data arrays.

In the Central Federal District, a project is underway to build an Italian foundry plant. Negotiations were held on expanding the production capacity of the plant of this company in the SEZ of industrial-production type. During the meeting, an agreement was reached to begin preparatory work for the construction of a foundry plant in January 2019, which would attract additional investment in the region. Foundry is one of the most important technological processes for creating the company's products, the implementation of which will allow us to develop cooperation in other areas.

In the Central Federal District, the investor plans to create an enterprise for the development of innovative technologies. The investor is developing a technology to make metal balls stronger, which are used for ore dressing, grinding of various media, in mechanical engineering, the oil industry and other areas.

The investor will build a logistics center in the Central Federal District. Its capacity will be over 20 thousand pallet spaces. It will serve as a distribution and sorting center for plant protection products for agricultural enterprises and farms in the region. The total investment in the project is estimated at 500 million rubles.

A Swiss company is going to build a crop protection agents plant in the Special economic zone in the Central Federal Region. The project will require 1,6 bln rub. The plant will produce herbicide mixtures, concentrates and suspensions based on original active substances, recipes and technologies of the Swiss company.

In the Central Federal District, the investor plans to increase the range of import-substituting products: packaging and labels. The total project budget is 84.7 million rubles.

The Investor company is going to proceed with a project to build a soybean processing enterprise in the Central Federal Region.

In the Central Federal District, the Special Economic Zone has begun work on the creation of engineering infrastructure in Phase 2.

An extreme park is planned to be built in the Central Federal District. According to the project, in the extreme park it will be possible to practice such technical sports as halfpipe, freestyle, snowboarding, skateboard, freestyle motocross and others related to extreme. Houses for living, a hotel, a cafe, a sports bar will be built.

The investor is implementing a project for deep processing of peas in the Central Federal District. The enterprise will produce protein ingredients, dietary fiber and starch products for the food industry. On the site with an area of 20 hectares, it is planned to organize the processing of more than 50 thousand tons of dry peas per year. The volume of investments in the project is more than 4 billion rubles.

The investor plans to place in the Central Federal District the production of perfume oils and compositions of cosmetic products. The project cost is estimated at more than 250 million rubles. The production will be located on an area of more than 1.5 hectares.

The Investor is going to launch an electric motors production plant in the Central Federal Region in 3 years. 1.5 bln rub investments are expected to launch the enterprise with production capacity of about 25 thousand motors per year.

The investment company producing wire, chain and spring items is set to continue investing in a plant expansion in the Central Federal Region. 5 mln euros will be used for these purposes in 2020.

The company plans to invest 5 billion rubles in the construction of a plant for the production of a wide range of printing products for industrial use and packaging materials. The new enterprise will create 280 jobs. The project is of fundamental importance for the dairy and juice industries due to the monopolization of the production of aseptic cardboard packaging by foreign corporations.

In the Central Federal District, an investor can build a plant for the production of animal feed. This is an enterprise with an investment of 1.27 billion rubles. The company plans to produce 15 thousand tons of feed flour and 3.3 thousand tons of animal fat per year at the Yelets site.

In the Central Federal District, the investor company is implementing a project for the construction of the third stage of a greenhouse complex with an area of 11 hectares. The amount of investment was about 2 billion rubles. The company already owns 9.5 hectares of greenhouses producing cucumbers and tomatoes. The project for the construction of a greenhouse complex with fifth generation technologies was launched in the Central Federal District in mid-2013. The design area of the complex is 71.9 hectares. The total cost of the project is 15.8 billion rubles. After completion of construction, scheduled for 2020, the mill will produce 61.5 thousand tons of vegetables per year.

The investor, whose main activity is the Processing and preserving of vegetables, conducts work under the project "Construction of a production and warehouse complex." The area of the complex is about 10 thousand square meters. Currently, the construction of the facility is underway. The general contractor is a company from Lipetsk.

A foreign investor with a representative office in Russia plans to establish a production of soy isolate. The total amount of declared investments is about 3 billion rubles. The company plans to start production in 2018. The project aims to develop the production of soy isolate, previously not produced in Russia and replace imported isolate.

In the Central Federal District, the construction of a greenhouse plant is underway. The approximate cost of the fifth-generation greenhouse plant UltraClima will be 18 billion rubles. The area of greenhouses where basalt wool will grow cucumbers, tomatoes and greens, presumably 60 hectares. This will allow producing at least 60 thousand tons of vegetables per year.

An investment project of construction of a grain storage, processing and transshipment center with a capacity of 40 thousand tons of storage will be delivered in the Central Federal Region. The investor is going to spend 600 million rubles on the project.

Investment project of building a dairy plant for 200 heads of cattle will be launched in the Central Federal Region. Investor is going to invest 730 mln rub in the project. Construction is being carried out in the project.

An investment project for construction of a compound feed plant with a capacity of 20 thousand tons per year will be launched in the Central Federal Region. The investor is going to invest 430 million rubles in the project.

In the Central Federal District, the investor company plans to implement a project for the construction of a coffee processing plant (2nd stage).

In the Central Federal District, an investor company plans to build a shopping center. The shopping complex will have only one floor. The area of the facility will be over 11,000 m2, and 1,460 m2 will be built for trade in it.

In the Central Federal District, the investor company plans to build a grain cleaning warehouse and reconstruct livestock buildings.

The company intends to invest in a new enterprise for processing agricultural crops. The production location is planned in the territory of the special economic zone in the Central Federal District. Presumably, the investor will start production in 2020. It is planned to create 77 jobs.

In the Central Federal District, it is planned to build a factory of electric motors for the automotive industry. Initially, the company produced electric motors for bicycles and motorcycles. When production will be expanded, it is planned to supply products for the automotive industry and utilities.

In the Central Federal District, the investor has invested 150 million rubles in the production of batteries of popular AA and AAA formats. More than 300 thousand lithium batteries are produced at the plant annually.

In the Central Federal District, the investor modernized a potato processing plant. The project cost amounted to RUB 650 million. The modernization made it possible to significantly increase the processing speed and improve the quality of finished products.

An investor who specializes in the production of crude vegetable oils intends to launch two new projects in the Central Federal District. The first investment project - “Construction of a plant for refining and deep processing of oil” will require an investment of 150 million rubles from the company. The project implementation period is 2019-2020. The company will also build an elevator by investing in it at least 100 million rubles, which will help to dry sufficiently large volumes of oilseeds during the harvest season.

In the Central Federal Circle, the expansion of the poultry farm was completed. Investments amounted to about 100 million rubles.

Project: Construction of an enterprise for the production of components of protected soil technology. For the first time, the plant’s products will be used to build the Mirlion plant itself. The plant will produce associated buildings, offices, warehouses in Lipetsk .. Of these structures, a plant will be built for these buildings on the Yelets site of the Lipetsk SEZ Type of activity: industrial-production / technical-innovative Manufacturer of greenhouse constructions Mirlion, which received approval for the construction of the plant in SEZ “Lipetsk” will begin the implementation of its project worth 950 million rubles in June-July 2018. The first phase of the plant will be ready within three months after the start of construction. At first, the plant’s products will be used to continue the construction of the Mirlion plant itself. In particular, it is planned to produce hydroponics, metal structures, tanks, and containers. The project they want to implement in three stages, the power is not disclosed. The term of the project is seven years. It is planned to create 120 jobs. At the same time, the company already has partners developing greenhouses in the Dankovsky and Yelets regions.

The investor will carry out the reconstruction of the car repair enterprise. More than 100 million rubles will be invested in the project. The funds will be used to increase the area of the wagon assembly area, to reconstruct the press department, as well as to re-equip these sites.

In the Central Federal District, the construction of a plant for the production of electrical equipment is planned. The company conducts its business in 100 countries, the company does not stop there. This will be the second plant in the territory of the SEZ, the first plant was opened in June 2015, where components for low-voltage electrical panels are produced. The company plans include the construction of 8 enterprises for the production of electrical distribution and control equipment. The company expects to implement these plans within 4 years, the minimum amount allocated to the project is 700 million rubles.

In the Central Federal District, the design of a new plant for the deep processing of oilseeds (soybean / rape) has begun. The new complex will include a soy and rapeseed processing plant, oil hydration with lecithin production, production of soy protein concentrates, an oil storage and a modern silo-type elevator. The final products will be fodder soybean meal with various protein contents, rapeseed meal, hydrated soybean oil, rapeseed oil, vegetable lecithin and soy protein concentrate.

A company producing seals for white equipment in the Central Federal District will invest 202.6 million rubles in expansion of production. The project involves the launch of four production lines for the production of gaskets for refrigeration equipment. After this, the plant’s capacity will double and amount to about 500 thousand units per month.

In the Central Federal District, an American company is implementing a project to build a plant for the production of prepared animal feed for 3.7 billion rubles. The corresponding project was presented and approved on November 20 at a meeting of an expert council to review business plans of investors planning to obtain resident status on an industrial site.

Investor is going to proceed with the third phase of modernization of its plant in the Central Federal Region. A modern concrete-mixing section will be built as part of the project. It will enable to considerably expand range of products, improve quality and increase labor efficiency.

In the Central Federal District, it is planned to build a new landfill for the disposal of municipal solid waste.

The company producing industrial gases is going to invest in the project of a new air separation plant and infrastructure for production of gases in the Central Federal Region. It is supposed that the Investor will invest 7.7 billion rubles in the new project.

In the Central Federal District, the construction of a pulp drying department has been completed. The construction is carried out by a local company at a sugar factory, and is part of a large plan for the modernization of the factory to re-equip it with modern equipment. The equipment supplier is a foreign partner of the company

The Central Federal District completed the implementation of the project "Reconstruction and Development of the Airport." About 1 billion rubles were allocated for its implementation. reconstruction of the runway, the construction of a new drainage system, new light-signaling equipment was installed, a checkpoint across the state border of the Russian Federation was equipped, border-customs control equipment was set up for the like.
Tell us whether you accept cookies

We use cookies to collect information about how you use Investportal.info. We use this information to make the website work as well as possible.