Investment projects in the region "Kaliningrad region"

ProjectsProjects map
Information on this page is not full. Sign up and get demo access to see the full version.Request demo access
ID/addedID/added
UpdatedUpdated
NameName
StageStage
RegionRegion
SectorSector
InvestmentsInvestments
OwnershipOwnership
Materials

An agricultural factory in the Northwestern Federal District will build a production and logistics center. It is planned that the design of the facility will begin in May 2019.

In the Northwestern Federal District, it is planned to implement a project for the construction of a new customs and warehouse terminal. Estimated investments will amount to about 160 million rubles. The project will be implemented in the special economic zone.

Investor will launch a project 'Creation of a half-finished food plant'. Investments will amount to more than 100 mln rub. The average number of workers will be 126 people. Designer and building contractor have been selected, their names are not disclosed. Project implementation period is not disclosed. Resident status has already been obtained.

The company is considering options for the construction of a factory for the production of galvanized steel coils. An industrial park is considered as the location of the plant. To accommodate the plant, a land plot of 10 hectares is needed. The existing and potential resources of the industrial park for energy supply and technical connections satisfy the needs of the investor. The volume of investments in the project is more than 50 million rubles.

In the Northwestern Federal District, the investor company plans to implement a project for the construction of an apartment-type hotel.

The Investor is going to build agricultural and engineering infrastructure facilities to contribute to high-tech agricultural industry in the Northwestern Federal Region. 67.6 million rubles will be invested in the project.

The investor will build a shopping center on the site of the former mini-market in the Northwest Federal District. The tenant of the land is already demolishing the pavilions. On a plot of 2.3 thousand square meters, a three-story administrative building with shops will be built. The developer intends to obtain a building permit in the next month.

A marzipan, chocolate and ice cream plant will be built in the industrial park in the Northwestern Federal Region, on the territory of more than 2 hectares by 2022. More than 50 million rubles will be invested in the construction of the plant.

The investor plans to build a plant for the production of flax. Investments in the project will amount to more than one billion rubles. The company plans to produce non-woven fabric and granular absorbent filler, used, including in construction, medical and military industries. Land will be acquired. The project involves a phased development.

The limited liability company became a resident of the SEZ North-West Federal District and intends to create a production of processed cheese. The volume of investments in the project will amount to 289 million rubles. It is planned that 14 new jobs will be created at the production site.

A Chinese company is set to build a plant manufacturing medical protection equipment in the North-Western Federal Region. The plant will manufacture protection equipment, masks, isolation gowns, and such additional medical goods as syringes.

The enterprise, which is part of the innovation cluster in the Northwestern Federal District, will create the production of Smart and Sim cards. For the production of smart cards, a special room was allocated and equipment was purchased. Also, several employees were transferred to a new highly automated line, who had undergone appropriate training. The total cost of the project was about 2.5 million euros.

In the Northwestern Federal District, it is planned to build a biological waste disposal plant. The joint venture, with Russian and foreign capital, will deal with the disposal of biological waste in the region. Currently, the company is updating the design and estimate documentation and preparatory work is underway to place such an object on the territory of the municipality.

In the north-west of Russia it is planned to build a logistics center. The investing company plans to become a resident of the special economic zone. As part of the project, it is planned to build a modern logistics center, pallet warehouses, refrigerators. In addition, the car park can be expanded.

The investor is going to build a hotel instead of an unfinished building. The investor plans to increase the number of storeys in the building, which was discussed with authorities.

In the Siberian Federal District, an investor company is implementing a project to build a modular infection center.

The investor, who is the company, proposes to build a terminal for the discharge, filling and storage of liquefied petroleum gas (LPG) in the area of the railway station in the city district. The project cost is estimated at 2.9 billion rubles. Of these, about 1 million rubles. make up the investor’s own funds. The construction of the terminal will take about two years and will require the creation of more than 80 new jobs. Currently, cadastral works are being carried out in the territory selected for the construction of the terminal. In addition, the investor agreed with the opinion of the Council on the need to adjust the originally declared area of the site in the direction of its reduction.

In the North-West Federal District, the investor company plans to implement a project to reconstruct the water-salt complex.

The Architectural and Urban Planning Council approved the project of a residential complex in the North-West Federal District. The construction will be carried out on the territory of the former intercept parking lot. According to the project, the complex includes 5 houses, the variable number of storeys of the project is 9-14 floors.

In the Northwestern Federal District, the investor company plans to build an entertainment center. It is planned that it will include a hotel, an indoor water park, a gym, an ice rink and a summer outdoor water zone. Investments will amount to 500 million rubles.

The project for the construction of a vegetable greenhouse heated by burning garbage. The company plans to build a 10-hectare greenhouse with a 14-hectare power unit. It is planned to use German equipment to organize the incineration plant, and Greek technologies for growing vegetables for the greenhouse. The plant capacity under the project is up to 80 thousand tons of garbage per year. The investor is already negotiating with banks about project financing. . The plant will be able to provide year-round operation of the greenhouse.

The investor plans to build a mine for the extraction of potassium and magnesium salts and a concentration plant in the village. It is planned to transfer 20.5 thousand square meters of land into the construction of an industrial enterprise for the enrichment of potassium and magnesium salts in the field.

The Investor is going to build a plant producing liquid organic fertilizers, organomineral fertilizers and feed additives in the Northwestern Federal Region. Investments in the project will amount to 61.6 million rubles.

In the North-West Federal District, the investor plans to organize the production of flooring. Investments in the project are estimated at 100 million rubles.

A foreign investor is planning to build a high-tech multidisciplinary medical center in the Northwest Federal District. This will be a complex of 78 thousand square meters. m and worth about 250 million dollars. The full amount of financing will be provided by a foreign company, the authorities of the region and a local company will provide infrastructure.

A waste sorting plant will be built in the North-West Federal District. The maximum investment in the project will amount to over 2 billion rubles.

In the Northwestern Federal District, the investor company plans to invest more than 1 billion rubles in the modernization of the enterprise.

In the Northwestern Federal District, it is planned to implement a new production of equipment for outdoor activities, including engines for snow-swamp equipment. It is planned to place production in the territory of the special economic zone of the region. After the construction of the plant, the investor expects to increase the output of export-oriented products tenfold.

A transport and logistics center will be built in the Northwest. The center will be designed for transshipment of transit containers from the Russian standard gauge to the European one and in the opposite direction.

The investor plans to build a meat and bone meal plant in the North-West Federal District. The construction should be completed before May 25, 2021.

In the North-West Federal District, the investor will invest 56.7 million rubles in organizing the production of household and sanitary and hygienic products.

In the Northwestern Federal District, the investor company plans to implement a project for creating flax production.

In the Northwestern Federal District, the largest manufacturer of packaging materials is considering options for expanding the range of products: it is planned to master the production of packaging for fruits, berries and vegetables, and to start producing disposable tableware. Investments in the development of the factory in the next five years may amount to about 0.5 billion rubles.

The investor intends to modernize the fixed assets of the slaughter in the North-West Federal District. The project cost is 155 million rubles.

An investor in the North-West Federal District, after the readiness of the first stage, plans to significantly increase the capacity of the complex for deep processing of flax. Commissioning of two stages of processing - July 2022.

An Investor is going to build a plant for production of biodiesel, pharmacopoeial glycerin and rapeseed meal. About two billion rubles will be invested in the project.

An investor in the Northwestern Federal District plans to invest 1.077 billion rubles in the construction of a complex for deep processing of flax, a company representative said during a meeting of the regional investment council on Friday. Commissioning of two stages of processing - September 2020.

In the North-West, it is planned to build a center for reproductive medicine. The center plans to provide reproductive health services in collaboration with the regional perinatal center. The purpose of the project: the provision of high-quality outpatient medical services in the field of reproductive health, a range of treatment measures for assisted reproductive technologies. The construction cost is estimated at over 200 million rubles.

The plans of the investor and general contractor include work on the organization of a Class A pharmaceutical warehouse for 10 thousand tons of product storage, in accordance with GSP standards. Estimated area of the facility will be 10-12 thousand square meters. The full range of work is planned to be completed in 2018.

The Investor is going to build an innovative textile fabrics plant in the Northwestern Federal Region. The company will invest at least 184 million rubles in the enterprise.

In the Northwestern Federal District, it is planned to implement a project for the construction of an egg powder plant. The complex will produce pasteurized egg white and yolk, melange, egg powder, which are used in the production of mayonnaise, sauces, which are used in the confectionery, baking industry.

The Investor is going to build a PCB manufacturing plant in the North-Western Federal Region. The total budget of the project will amount to 149 million rubles.

Investor is going to open a manufacturing site in the North-Western Federal Region to build 24-40-meter ferries and other ships using alternative energy sources. The investments in the project will amount to 53 min rub.

Complex reconstruction of the airport. The project includes: increasing the length of the runway, increasing the maximum throughput of the airport terminal, as well as expanding the area of the airport complex by ten thousand square meters. As part of the second stage, the runway, taxiways, aircraft parking lots, airport engineering systems and other auxiliary works will be reconstructed. It is planned to complete all work before the end of 2017.

In the North-West Federal District, the investor intends to build a company for the production of granular materials. It is planned that 253.7 million rubles will be invested in the project.

A plant for the production of children's and sports equipment for outdoor playgrounds will be built in the North-West Federal District. The company plans to start building its own plant in 2020. Investments in the project will amount to at least 80 million rubles. In addition to playgrounds, the company intends to produce sports equipment for crossfit and outdoor workout.

A dairy livestock farm will be built in Kaliningrad region. The project is supposed to create 131 jobs. The livestock farm is designed for 3.6 thousand heads of cattle and will consist of 29 buildings.

The developer company plans to build an apartment building in the city of Svetlogorsk. Area: 4520 sq.m. Housing class: comfort. Infrastructure: 1st stage of construction (MZh D No. 1 for GP, MZh D No. 2 for GP, MZh D No. 3 for GP): plot area -5013 sq.m. playground for physical culture, carousel KSIL-Kaliningrad 4193, horizontal bar adult KSIL-Kaliningrad 6734, parallel bars KSIL-Kaliningrad 6720, bench KSIL-Kaliningrad 2102, ballot box KSIL-Kaliningrad 1111. 2nd stage of construction (MZh D No. 4 according to GP, MZh D No. 5 for GP, MZH D No. 6 for GP): plot area -5453.7 sq.m. a playground for physical culture, a roundabout KSIL-Kaliningrad 4193, an adult horizontal bar KSIL-Kaliningrad 6734, parallel bars KSIL-Kaliningrad 6720, a bench KSIL-Kaliningrad 2102, a bin KSIL-Kaliningrad 1111, a children's sports complex KSIL - Kaliningrad 6108, stage 3 of construction ( MZh D No. 7 according to GP, MZh D No. 8 according to GP): plot area -4733.3 sq.m. playground for physical culture, carousel KSIL-Kaliningrad 4193, horizontal bar adult KSIL-Kaliningrad 6734, parallel bars KSIL-Kaliningrad 6720, bench KSIL-Kaliningrad 2102, ballot box KSIL-Kaliningrad 1111

The developer company plans to build an apartment building in the city of Svetlogorsk. Area: 2512 sq.m. Housing class: comfort. Infrastructure: 1st stage of construction (MZh D No. 1 for GP, MZh D No. 2 for GP, MZh D No. 3 for GP): plot area -5013 sq.m. playground for physical culture, carousel KSIL-Kaliningrad 4193, horizontal bar adult KSIL-Kaliningrad 6734, parallel bars KSIL-Kaliningrad 6720, bench KSIL-Kaliningrad 2102, ballot box KSIL-Kaliningrad 1111. 2nd stage of construction (MZh D No. 4 according to GP, MZh D No. 5 for GP, MZH D No. 6 for GP): plot area -5453.7 sq.m. a playground for physical culture, a roundabout KSIL-Kaliningrad 4193, an adult horizontal bar KSIL-Kaliningrad 6734, parallel bars KSIL-Kaliningrad 6720, a bench KSIL-Kaliningrad 2102, a bin KSIL-Kaliningrad 1111, a children's sports complex KSIL - Kaliningrad 6108, stage 3 of construction ( MZh D No. 7 according to GP, MZh D No. 8 according to GP): plot area -4733.3 sq.m. playground for physical culture, carousel KSIL-Kaliningrad 4193, horizontal bar adult KSIL-Kaliningrad 6734, parallel bars KSIL-Kaliningrad 6720, bench KSIL-Kaliningrad 2102, ballot box KSIL-Kaliningrad 1111

The developer company plans to build an apartment building in the city of Svetlogorsk. Area: 2480 sq.m. Housing class: comfort. Infrastructure: 1st stage of construction (MZh D No. 1 for GP, MZh D No. 2 for GP, MZh D No. 3 for GP): plot area -5013 sq.m. playground for physical culture, carousel KSIL-Kaliningrad 4193, horizontal bar adult KSIL-Kaliningrad 6734, parallel bars KSIL-Kaliningrad 6720, bench KSIL-Kaliningrad 2102, ballot box KSIL-Kaliningrad 1111. 2nd stage of construction (MZh D No. 4 according to GP, MZh D No. 5 for GP, MZH D No. 6 for GP): plot area -5453.7 sq.m. a playground for physical culture, a roundabout KSIL-Kaliningrad 4193, an adult horizontal bar KSIL-Kaliningrad 6734, parallel bars KSIL-Kaliningrad 6720, a bench KSIL-Kaliningrad 2102, a bin KSIL-Kaliningrad 1111, a children's sports complex KSIL - Kaliningrad 6108, stage 3 of construction ( MZh D No. 7 according to GP, MZh D No. 8 according to GP): plot area -4733.3 sq.m. playground for physical culture, carousel KSIL-Kaliningrad 4193, horizontal bar adult KSIL-Kaliningrad 6734, parallel bars KSIL-Kaliningrad 6720, bench KSIL-Kaliningrad 2102, ballot box KSIL-Kaliningrad 1111