Investment projects in the region "Kabardino-Balkarian Republic"

ProjectsProjects map
Information on this page is not full. Sign up and get demo access to see the full version.Request demo access
ID/addedID/added
UpdatedUpdated
NameName
StageStage
RegionRegion
SectorSector
InvestmentsInvestments
OwnershipOwnership
Materials

In the North Caucasus Federal District, the investor company plans to implement a project for the construction of a plant for the production of reinforced concrete products.

Over 300 mln. rubles will be invested in the repowering of a substation in the North Caucasus Federal Region. A new administrative building will be built on the territory of a feeding center within 2 years. But most importantly is that all needed electrical equipment from the list will be purchased and installed to provide a rated power of 110/6 kW.

In the North Caucasus Federal District, the construction of a complex for growing, storing, processing, packaging and selling fresh vegetables was completed.

In the North Caucasus Federal District, within the framework of a public-private partnership, it is planned to build a tourist complex.

A private investor in the North Caucasus Federal Region has decided to build a factory for bottling drinking water in plastic bottles. As of early 2020, the project is at the phase of initial development. There are not many details available.

Fruit storage facilities with a sorting section will be built in the North-Caucasus Federal Region. It will be designed for one-time storage of 7 thousand tons of fruit and berry products.

A private investor is planning to build a plant for pure polymers in the North Caucasus Federal Region. It was supposed that 15.7 billion rubles will be poured into the project, including 1.446 million rubles - funds from the Investment Fund and the budget of the Republic of Kabardino-Balkaria, the rest - private investments.

In the North Caucasus Federal District, it is planned to implement a project to resume the extraction and processing of tungsten-molybdenum ores. Investments in the project may amount to 20 billion rubles.

It is planned to carry out overhaul of the bridge in the North Caucasus Federal District. Customer - PKU UPRDOR region. All work, according to the contract, must be completed before the end of 2017. A tender has now been announced for the development of working documentation. The initial contract price is over 9 million rubles.

In the North-West Federal District, it is planned to create a hydrometallurgical production. The investor company presented a preliminary master plan for the future plant. The issues of technical feasibility of connecting the facilities of the new hydrometallurgical production to engineering infrastructure communications are considered.

An investor, within the framework of a regional plan for import substitution, is implementing a project to create an enterprise for the production of copper wire rod. Currently, separate production areas have been defined on the territory of the plant for the implementation of the investment project "Creation of an enterprise for the production of copper wire rod and wire rod from low-alloy copper wire" bare wires "by the method of" oxygen-free copper ".

Reconstruction of the health center is being carried out in the North Caucasus Federal Region. There will be 200 suites with separate pools in the four-storied building and a dining room. Medical rooms, a dental office, a pharmacy, a beauty parlor, a gym with exercise machines, a conference hall as well as a restaurant will be located in a two-storied new building connected to the renovated old one.

In the North-West Federal District, they plan to build a plant for the production of agricultural machinery. The annual output will be about 600 thousand disks, as well as 600 trailers of various modifications with a carrying capacity of 4.5-13 tons. The average annual production volume will reach 3.4 billion rubles. It is planned to create more than 200 new jobs. Now the plant employs 56 people with an average salary of 18.5 thousand rubles. At the moment, the plant team has been dissolved due to lack of orders.

A tourist and recreational cluster may be built in the North-Caucasus Federal Region.

In the North Caucasus Federal District, it is planned to implement a project for the construction of a tourist and recreational cluster.

A full-cycle center including phases from creation of varieties and hybrids of different crops to the seed production and sale will be built in Kabardino-Balkaria. New center's production capacity will be 5 thousand tons of crops per year. The project will have several phases.

The investor planned the construction of a sports complex. Investments in the project were not specified, as well as the timing of the project.

The investor company intends to expand production in the North Caucasus Federal District. Within the framework of the project, it is planned to introduce the second and third stage of the complex for the production and processing of tomatoes. To this end, management plans to attract outside investors.

On the basis of the existing enterprise, the production of X-ray equipment, namely 3D cone beam tomographs, which will allow to obtain panoramic images, will be launched. Reconstruction will be carried out. The project is designed for five years. The bulk of the financing is provided by the Development Corporation. The contribution of the project initiating company should be at least 150 million rubles. The total investment in the project will be about 600 million rubles.

The investor company plans to build a milk processing plant on the basis of a capacity of 20 tons per day in the North Caucasus Federal District. The implementation of new investment projects in the dairy industry of the republic will lead to an increase in production by 30% and an expansion of the range of products

A joint stock company engaged in investments in authorized capital, venture capital investment, including through investment companies, announced a tender for the development of urban planning documentation for an all-weather tourist and recreational complex. As part of the set of documents, a project for planning the territory, a project for surveying the territory, a plan for the arrangement and the corresponding material and technical equipment will be prepared, as well as the issues of ensuring the safety of the resort will be resolved.

In the North Caucasus Federal District, it is planned to modernize the enterprise manufacturing plastic containers. The investor plans to launch a new production of modern packaging for agriculture. Estimated investment in the project is 600 million rubles.

In the North Caucasus Federal District, it is planned to implement a project of an enterprise for the production of equipment for ski resorts. It will be a joint venture with French partners. In the future, the parties plan to switch to the production of individual elements, which will increase the percentage of localization of full-cycle production.

The general director of the company engaged in the production of paints, varnishes and similar materials for applying coatings, printing inks and mastics, presented a project for the creation of paint and varnish production in the Kabardino-Balkarian Republic. A project worth 300 million rubles should become the largest producer of environmentally friendly water-based paint in the south of Russia.

Investment projects with a total value of more than 1.5 billion rubles are being implemented in the region in 2018 as part of the Development of the Federal District program. The investor company will create the production of concrete pillars for use in intensive gardens. The volume of investments in the project will amount to 150 million rubles.

The investor company, whose main activity is the production of instruments and equipment for automatic regulation or control, intends to implement the project of creating an enterprise for the production and assembly of snow generators and their components in the North Caucasus Federal District.

In the North Caucasus Federal District, it is planned to build a new airport complex. The total investment in the project is estimated at 4.7 billion rubles. To date, design work has been completed, a large company has taken up the construction of the facility.



The investor has implemented the investment project "Construction of a balneological sanatorium". His specialization will be balneological procedures using hydrogen sulfide mineral waters (restoration of the once popular and very useful sulfur baths. The sanatorium will be able to host up to 230 vacationers. The sanatorium is one of the objects of the Zaragizh cluster.

For the period 2017-2018. in the North Caucasus Federal District, it is planned to build a milk processing plant with a capacity of 20 tons of milk per day. The implementation of new investment projects in the dairy industry of the republic will lead to an increase in production by 30% and an expansion of the range of products.

The construction of a tomato paste production plant has been completed in the North Caucasus Federal District. The cost of the investment project is 3 billion rubles. Large-scale construction is underway, equipment is being purchased. The launch of the first line is planned in September this year.

The investor completed construction work under the project "Construction of a plant for the processing of milk and dairy products." Investments in the project amounted to about 100 million rubles. The buildings are built, equipment is being purchased. The official launch will take place in the first quarter of 2018.

In the North Caucasus Federal District, the organization of the production of syringes is palpable. The new enterprise will be located on the production facilities of the existing plant. Productivity of the enterprise upon reaching its design capacity will be 250 million syringes per year worth more than 380 million rubles. More than 100 new jobs will be created

In the North Caucasus Federal District, the opening of a new innovative production of modularly assembled earthquake-resistant energy-efficient home-building panels using the technology of an Italian company. . The new production allows for the integrated construction of buildings using a single building system, optimizing the supply and supply of the main building material - panels for construction sites, the timing of construction of facilities and labor costs.

The investor is building a new storage facility in the North Caucasus Federal District. The project involves the construction of a fruit storage with a controlled gas environment and a dynamic cooling system, the availability of its own laboratory for express analyzes, a sorting unit.

In the North-West Federal District, it is planned to build a plant for processing apples and producing apple concentrates. Its total productivity will be 40 thousand tons per season. The project is included in the development plan for intensive gardening in the republic. The production and processing of garden products is expected in conjunction with a foreign company

In the North-West Federal District, the construction of a poultry complex and a feed mill continues. The company intends to increase production capacity for poultry meat production by 12 thousand tons per year. Production sites will be built for 800 thousand poultry for one-time planting and a complex of enterprises for the storage, processing of cereals, legumes and oilseeds with final feed for all types of animals with a capacity of 160 thousand tons. At the moment, work is underway at the broiler feeding site to bring production capacities to 200,000 heads of one-time planting. A metal frame was erected on two new houses.

The investor has invested 350 million rubles in the construction of a complex for breeding sturgeon and sterlet in Kabardino-Balkaria (CBD), which is scheduled to be launched this year. The enterprise is designed to produce about 50 tons of sturgeon fish and more than 3 tons of food caviar per year. The factory installed Italian equipment that provides air conditioning and ventilation.

Implementation of the investment project "Construction of a modern, modern fruit storage with a capacity of 30 thousand tons of raw materials" continues in the North-Caucasian Federal District. About 200 million rubles will be invested in the project. To date, the first stage is completed. There are several more steps ahead. By the end of 2016, the project should be completed.

In the North-Caucasian Federal District, the investor company is implementing a project to build an enterprise for the production of automobile gas-filling compressor stations. This type of equipment is in demand in terms of import substitution, it has stable prospects for growing demand. It is planned to complete the project by 2015.

In the North-West Federal District, the construction of a fruit storage facility has been completed. The project was implemented by a local agro-industrial enterprise for its own needs. The capacity of the new fruit storage was 1,500 tons of products. Construction was necessary due to the expected increase in production volumes.

The investor company completed the construction of a modern fruit storage with a one-time storage capacity of 60 thousand tons of fruits and vegetables. The fruit storage is equipped with refrigerated warehouses for 25 thousand tons of products. The projected capacity is planned for 2020.

In the North Caucasus Federal District, the construction of a feed mill was completed. The total project cost is more than 300 million rubles. The capacity of the enterprise is 10 tons per hour of granular feed. Commissioning took place in 2016.

One of the largest textile factories in Russia has opened. The company will begin to operate at full capacity in 2016. When launched at its design capacity, it will become one of the largest in Russia for the production of knitted fabric with a production volume of up to 1 billion rubles per year. Installation of equipment at the enterprise will be completed this month, and the factory is scheduled to begin operation in the first quarter of 2016. The first stage has been implemented - in the amount of more than 700 million rubles. Now the factory is already producing products.

In the North-Caucasian Federal District, an investor company with financial support from the Agricultural Bank is implementing a project to build and equip a high-tech fruit storage with a single capacity of 90,000 tons with refrigerators for storing about 140 thousand tons of fruits at a time.

In 2015, in the North Caucasus Federal District, the construction of a modern complex for growing, storing, processing, packaging and selling fresh vegetables was completed. The volume of investments amounted to 3.7 billion rubles.

In the North-West Federal District, it is planned to build a new canning factory. The plant should reach its full design capacity in 2017. The total investment in the construction of the plant amounted to 1.2 billion rubles.

The project provides for the construction of a hotel at an altitude of 4,000 meters. The number of places is 48. The hotel is being built as part of a project that implies, along with the construction of high-mountain hotels, the creation of a unified infrastructure for the logistics of travel, the development of standard routes in all regions, as well as the creation of a single Internet portal ...

The project involves the construction of a brick factory in the North Caucasus Federal District. The production lines include the use of modern equipment, robotic manipulators, Italian drying and firing technology. Construction work is carried out by the company. As of September 2011, construction work is ending and installation of equipment begins. Equipment commissioning is scheduled for the end of 2011 ...
Show by:2550100300
Tell us whether you accept cookies

We use cookies to collect information about how you use Investportal.info. We use this information to make the website work as well as possible.