In the Siberian Federal District, it is planned to build a center for rejuvenation and energy correction. On a land plot of 26 hectares, it is planned to build a center, which will consist of 5 buildings, 7 baths, a dining room, a cafe, a room for spa treatments, a health complex, a recreation area, a garden, an outdoor sports summer area.

A cannery, which will produce about 35 million cans of canned food per year, is planned to be built in the Siberian Federal District. The project began to be implemented in 2017, design estimates have already been developed. Further implementation is planned in 2020, commissioning of the plant - 2021. The volume of investments in the project will amount to 220 million rubles.

The investor company has begun to create a new production. The implementation of the project involves the construction of new facilities: a gold recovery plant, a hydrometallurgy workshop, a tailings pond for flotation concentrate sorption tailings and a heap leaching map. The purpose of the proposed activity is to increase gold mining.

An investor company is going to build a wood processing plant in the Siberia Federal Region, that will produce a wide range of cut sawn timber and planed products. At the same time, all the waste generated will be used to produce pellets.

In the Siberian Federal District, the investor is going to create a fish processing complex. Investments will amount to about 150 million rubles, 20 jobs will be created.

Coal-preparation plant will be opened in Siberia Federal District. There are more than 90 mln dollars required for the coal-preparation plant construction and railway siding construction. The annual coal mining volumes will be 2,0 mln tons on the first stage of coal mining, further it will be increased to 5,0 tons per year.

The project for the integrated development of dairy farms is carried out by a Russian company in the Siberian Federal District. About 70 million rubles have already been invested: land has been leased, equipment, livestock buildings, cattle, and a line for processing and production of packaged milk with a productivity of five tons per day have been purchased. The total project amount will be more than three billion rubles.

A manufacturer of confectionery products in the Siberian Federal District is ready to invest several tens of millions of rubles in opening a new production in the food industry. According to preliminary estimates, it will take two years to implement these plans.

In the Siberian Federal District, the investor plans to build a complex for storage, shipment and processing of rapeseed at the industrial park site. Investments in the project - 800 million rubles.

An investment project “Construction of a coal processing plant as a part of developing a coal deposit” will be delivered in the Siberia Federal Region. The project is scheduled to run in 2019–2027. Over 3200 jobs will be created. The investments will total 43.13 billion rubles.

The investment project "Expansion of a champignon farm" is being delivered in the Siberia Federal Region. The idea of the project: opening an additional workshop for growing champignons and expanding the mushroom compost farm. The project cost is 71.5 million rubles.

The authorities in the Siberian Federal Region offered IT companies to create an innovative IT-oriented industrial park. The IT park is a separate building with an area of 5 thousand square meters on a 1.5-ha land plot. According to the park’s concept, the IT-center will house residents and necessary infrastructure, including a data-center, meeting rooms, a conference room, a server room, a dining room, a gym, etc.

Investor is going to pour money into modernization of aluminum plant in the Siberian Federal Region. In 2020 they are going to install a raw aluminum cleaning system in 10-ton buckets at the plant's foundry. This system will improve the purity of the metal and expand the possible areas products distribution.

Investor has scheduled to carry out modernization of electrodes production on the aluminum plant. This will be a large-scale modernization of anode furnaces. The modernization will be carried out in several phases. This investment project is scheduled to complete by late 2023. Total investments will amount to almost 12 billion rubles.

The investor plans to create a fruit garden. About 500 million rubles will be invested in the project. The land issue is being resolved.

The Investor is going to build a canned meat plant. The amount of investments and the project execution dates have to be confirmed.

The investor plans to build a workshop for the production of infant formula in the Siberian Federal District. It is planned to start construction in 2018, and start production by the end of 2019. The new workshop will employ 20 people. For production it is planned to use exclusively raw materials of local origin.

A brick factory will be built by an investor in the Siberian Federal District. The project cost 400 million rubles. If the project can be implemented, the company will produce 3 million rough bricks per year.

The investor is going to invest 1.7 billion rubles in the development of a coal deposit in the Siberian Federal District. during this year. Over the next two years, investments will reach 8.3 billion rubles. The company is considering the possibility of building an enrichment plant on a cross-section.

In Khakassia, the construction of an enrichment plant was launched for the leader of the global coal industry and the largest coal producer in Russia. According to the press service of the company, the project is designed for three years, the total investment will be about 3 billion rubles. It is planned that in 2021 the concentration plant will be able to reach the design capacity of 750 tons of coal processing per hour.

In the Siberian Federal District, it is planned to implement a project to create a new workshop for the production of elite cheese. The productivity of the workshop will be 2 thousand tons per year. It is assumed that the company will create 25 new jobs. Estimated investments in the project will amount to about 300 million rubles. It is planned to complete all work before the end of 2020.

Brick production will be increased in the Siberian Federal District. 100 million rubles were invested in the modernization of production lines.

The project for the integrated development of dairy farms is carried out by a Russian company in the Siberian Federal District. About 70 million rubles have already been invested: land has been leased, equipment, livestock buildings, cattle, and a line for processing and production of packaged milk with a productivity of five tons per day have been purchased. The total project amount will be more than three billion rubles.

The project for the integrated development of dairy farms is carried out by a Russian company in the Siberian Federal District. About 70 million rubles have already been invested: land has been leased, equipment, livestock buildings, cattle, and a line for processing and production of packaged milk with a productivity of five tons per day have been purchased. The total project amount will be more than three billion rubles.

In the Siberian Federal District, it is planned to implement a project for the construction of a waste recycling enterprise. Investments in the project can reach 800 million rubles. The company is scheduled to be commissioned by 2023.

The investor planned the construction of a metal frame factory. The construction was started in 2015, but for some reason it was not completed.

An investor company is going to carry out modernization and expansion of a bentonitic plant. Construction of the second phase of the drying and grinding facility will start this year, the production facilities for mixing and packaging units will be upgraded, and the development of deposits will continue. New storage and loading facilities will be built next year. The company is going to invest almost 800 mln rub in the development of a plant.

In the Siberian Federal District, it is planned to build an aluminum plant, which will operate on modern technology and produce more than 500 thousand tons of aluminum. the plant will become an anchor enterprise for the technological valley, within the framework of which it is also planned to develop the processing and foil production.

An investor company operating in the drilling and blasting market plans to build a factory for the production of industrial explosives. This was reported in the government of the republic of the Siberian Federal District. The volume of investments will be 100 million rubles. The company plans to implement the project during 2019. “Commissioning is scheduled for August next year. To implement the project, a new legal entity will be created, which is part of a group of companies.

The reconstruction of the international airport is planned in the Siberian Federal District. The project provides for the construction of a main emergency rescue station (OASC), a patrol road, a treatment plant system; equipping the airport with new light-signaling equipment, power supply system, transformer substations, as well as other types of work.

In the Siberian Federal District, it is planned to build a large livestock complex with the processing of biological waste into methane gas. The project will be held in two stages. The first stage is the launch of pork production. It will be a full-cycle production, from a feed mill to a slaughterhouse. At the second stage, the company will start producing cattle meat. The project provides for the construction of a pig farm for 120 thousand heads with a production volume of 28 thousand tons of meat in live weight per year.

The complex with an area of over 6,500 square meters is located in the Siberian Federal District. Productivity - from 20 to 40 sheep per hour, about 60 people will be involved in one shift at the enterprise. As the director noted, the completion of construction and commissioning of the enterprise is planned in September-October 2018. The workshop will include premises for slaughter, slaughter, deboning, cooling and freezing, packaging, shipment, as well as administrative and domestic ones. The project cost is about 500 million rubles.

A project to modernize the bakery is planned on the territory of the Siberian Federal District. The total cost of modernization is about 90 million rubles. The first 30 million rubles are required from the investor. The remaining amount the company will be able to earn on its own. At the end of the modernization, it will be possible to reduce bread prices by 15%.

In the Siberian Federal District, an automobile company is implementing an investment project for the construction of a service center. The construction of the center is scheduled to begin in October 2017 and to be completed in December 2018. The volume of investments will exceed 100 million rubles.

In the Siberian Federal District, it is planned to build a lamb processing industrial complex. The deep processing of mutton and access to new markets for environmentally friendly products are expected. The total amount of project financing is more than 350 million rubles.

Concentration factory reconstruction project. The factory carries out work on the enrichment of coal. As part of the project, the following will be built: the building of a complete transformer substation, a coal enrichment building. Construction financing is planned to be carried out at the expense of the developer’s own funds.


In one of the cities of the Siberian Federal District, it is planned to build a cultural and leisure center. According to the terms of reference, the project should include an auditorium with 100 seats with a stage, rooms for classes of musical groups, a workshop of an artist-decorator and a workshop of decorative and applied arts, a room for board games, office and technical rooms, it is also necessary to take into account the improvement of the adjacent territory.

In the Siberian Federal District, the construction of a ski resort is planned. In summer, hiking and rafting on mountain rivers will develop here, and in winter, the resort can claim to be a family center for skiing. The advantages of the project are the unique terrain, as well as the transport accessibility of the center. The construction of the ski center is designed for three years. The cost of work is about 1 billion rubles.

In the Siberian Federal District, it is planned to build a plant for the production of manganese metal. The estimated capacity of the plant will be 80 thousand tons of finished products per year. The plant will have about 1000 jobs and as many will be employed in auxiliary production units

In the Siberian Federal District, the construction of a livestock complex was completed. The facility is designed for a loose housing of 1100 goals. The total cost is almost half a billion rubles. The dairy herd is 2 thousand heads. The management plans to increase the livestock to 3 thousand and raise the gross yield to 30-35 tons.

A project has begun on the construction of an enrichment plant and a complex of satellite plants in southern Siberia. The new production complex will become the largest Russian iron ore beneficiation enterprise. Construction and equipment of production will be carried out according to the Finnish project. The factory will also be erected under the Finnish project, Outotec partners will provide advanced high-tech equipment. In addition, the Finnish company will coordinate the construction of a direct iron reduction plant. The project has already begun: a site has been selected for the construction of the plant, ore is being analyzed from deposits, the necessary charge is selected taking into account the development of mines and the possibility of growth of other raw material sources, the ore dressing technology is being determined. Calculated and the amount of investment in the project. As for the terms, it is planned that the development of design estimates and the purchase of technological equipment will be completed by 2016, and the new factory will issue the first products by 2019.

In the Siberian Federal District, a major overhaul of the bridge across the river is planned (stage 2). The contract price is over 250 million rubles. Customer - Regional Highway Administration. In February 2016, specialists completed the repair of the right half of the bridge, and the left side of the bridge is being prepared for closing for the duration of the repair. Overhaul of the bridge is planned to be completed in the 4th quarter of 2016.

In the Siberian Federal District, the construction of aluminum production is planned. The main advantages of the RA-550 electrolyzer are high energy efficiency and compactness. This will reduce the cost of production, reduce capital costs for the modernization of existing and construction of new factories

The investor company intends to organize in the city a modern enterprise for deep processing of wood, which would produce a large assortment of products, it is planned to fully use raw materials, including sawdust and shavings. The total investment is 450 million rubles, the company is ready to start production of products from October 2016

The implementation of the project - the construction of a new car dealership, the group of companies began in November 2013 in Siberia. This auto center has become an official dealer of a South Korean manufacturer in the republic. Investments in the project amounted to more than 150 million rubles. The opening of the car dealership took place on June 18, 2015.

The construction of a solar power station has been completed in the Siberian Federal District. A local energy company plans to build a solar power station. Its capacity will be 5.1 megawatts. The hydropower industry of the parent company will manage and operate the new station. It is planned to complete the project in 2015.

In the Siberian Federal District, work is underway to modernize the CHP. The volume of investments in the project is 10.6 billion rubles. As part of the modernization, the 4th power unit was launched, and switchgears were reconstructed. Installed electric capacity - 406 MW. Installed thermal power - 625 Gcal / h. In September 2014, a new power unit of the Abakan CHPP with an installed electric capacity of 136 MW was commissioned.

The mining and processing plant was commissioned in Siberia. The investor in the project was a Chinese company, which invested about four billion rubles in the project. At present, 846 people work at the GOK, of which 673, or 80%, are Russian citizens.

In the Siberian Federal District, work is underway to modernize the state district power station. The modernization process will take place in three stages and will be completed in 2014. . During a comprehensive modernization, the switchgear installed modern domestic and imported equipment that meets the highest requirements of operation and reliability, and also has a long service life (up to 50 years). With the commissioning of the last hydraulic unit, the design capacity of the enterprise amounted to 6400 megawatts.