In the Urals Federal District, the investor company plans to implement a project for the construction of a waste processing complex.

A workshop for the assembly of a new model of a tram car and electric bus will be built at the car-building plant in the Ural Federal District. Partially existing model range will be transferred to the same workshop and capacity will be increased up to 220 cars per year. The project will be implemented in 2019–2025.

In the Urals Federal District, the investor company plans to implement a project to build a logistics center.

In the Ural Federal District, enterprises will be created for the processing of waste from an iron ore enterprise. The volume of investments in the project will amount to 18 billion rubles. Preliminary approval of the allocation of the land has been received, but there are no rental documents that will provide an opportunity to dispose of this land and conduct construction or some development.

The investor announced the implementation in the Ural Federal District of an investment project for the purchase and installation of two new lines for the production of short-cut pasta. The project cost is 1.7 billion rubles.

The management company of the industrial park in the Chelyabinsk region has signed an agreement and a land lease agreement with a recycling company. The construction of a synthetic fiber plant and its commissioning are planned before the end of 2020.

Reconstruction and technical re-equipment of the production of electrical equipment The 2nd stage in the part of the first stage is completed, and the work of the second stage, the second stage of the already completed design work begins. The design documentation provides for the reconstruction and technical re-equipment of industrial buildings and storage facilities with a total area of 86.973 thousand m2

In the Urals Federal District, the investor company plans to implement a project to build a plant for processing dust from an electric steel-making production.

A large retailer decided to invest 2.5 billion rubles in launching a project in the Ural Federal District. The investor plans to launch the logistics complex in 2021.

A major metallurgic mill will carry out reconstruction of the blast furnace foundry yard No.2 in the Ural Federal Region. Also, a new aspiration system for better air purification will be created.

The Ministry of Industry and Trade of Russia entered into the register an industrial cluster of special equipment in the Ural Federal District. Within the framework of the industrial cluster, a project is being implemented - Mastering the import-substituting production of innovative insulated and non-insulated work and special clothes. The project cost is 500 million rubles.

The investor company plans to build an apartment building in the Ural Federal District; survey work has begun on the project.

The investor company plans to build an enterprise for the production of steel lining in the Ural Federal District.The project is at the stage of public discussions.

In the Urals, it is planned to build a glass container factory. It is planned to invest about 370 million rubles in the plant, which will produce 70 tons of products per day. The project is expected to pay off in less than two years. The implementation of the project is now at the design stage, the construction of the enterprise will begin this summer. On an industrial site with an area of 2.5 thousand square meters. Two machine lines and an annealing furnace will be installed.

The investor company plans to build in the Ural Federal District a data center with a capacity of 10 thousand server racks for storing and processing information. The data center will provide services for hosting server equipment, renting virtual data centers, cloud storage and computing, as well as hosting.

The project initiator company plans to build a fuel dispenser in the Ural Federal District. The total area of the shopping complex is 350 thousand square meters. The volume of investments in the project is not specified.

A plant manufacturing cranes, mining equipment and machine-tools will be built in the Ural Federal Region in cooperation with a large German mechanical engineering company. The site and investments in the project are being specified.

The investor planned the construction of a nuclear power plant. Construction is currently suspended for an indefinite period.

In the Urals Federal District, the investor company plans to implement a project to build a logistics center.

In the Urals Federal District, reconstruction of the airport will be carried out. The planned volume of investments is over 4 billion rubles. As a result of the reconstruction, the area of the terminal will double, which, according to the company's management, will allow changing the technology of passenger service and increasing their comfort.

In the Urals Federal District, the investor company plans to implement a project to build a center for education and innovation.

Preparations for an ambitious construction project have begun in the Urals Federal District. The developer plans to build a skyscraper in the city center. It is assumed that the height of the skyscraper will be 70 floors. But there are no clear project parameters yet, the building is at the design stage.

Investor is going to launch the project of producing personal care products - toilet paper - in the Ural Federal Region. Investor is ready to pour 479 mln rub into the project.

The investor company is awaiting funding to complete the construction and purchase of technological equipment for the plant in the Urals Federal District. Currently, only two production lines have been launched, which are limited in their production capacities. The company currently produces winding products (Inductors, sine filters, electrical cabinets).

In the Urals Federal District, the investor company plans to implement a project for the construction of a shopping and entertainment complex.

The investor is implementing a project to build a sturgeon fish breeding plant. Growing of aquatic organisms will be carried out in closed water supply installations.

The investor company plans to implement a project for the production of grinding balls in the Ural Federal District.The project is at the stage of public discussions.

In the Urals, they plan to create an agro-industrial park with an area of 150 hectares. The local agricultural complex is ready to invest about seven billion rubles in the project. 1,500 are planning to create jobs. The region has entered into an agreement with the monotowns development fund.

In the Urals Federal District, official hearings are held on the construction of a plant for the production of metal manganese. The project is planned to be launched at the site of the former plant. The volume of investments in the project is estimated at almost 2 billion rubles. Presumably, 400 jobs will be created.

The metallurgical plant plans to build a new sinter factory complex. As part of the project, an agreement was signed with a Chinese company for the supply of equipment worth 6.7 billion rubles. Total capital investments in the new sinter plant complex, with a production capacity of 5.5 million tons of blast-furnace raw materials per year, including construction and installation works, are estimated at about 22 billion rubles.

A modern raw material processing company and a producer of high-quality cereals and cereal flakes are going to build production and logistics facility with construction of platforms for processing of cereals, packaging of products and deep processing of crops, an elevator for receiving, processing and storing grain, as well as a logistic automated warehouse with an area of 11 thousand sq. m for storage and shipment of products.

In the Ural Federal District, a dairy complex is under construction. As part of a program to assist farmers, the government intends to subsidize half the cost of equipment for the milking complex. The new complex is planned to be equipped immediately with all necessary communications; electricity, gas, build good roads. The construction of infrastructure is also planned to be built at the expense of the regional budget.

It is planned to create an industrial park in the Ural Federal District. The project is estimated at more than 500 million rubles. The implementation of the project can give the city about 400 new jobs. The project is scheduled to be launched before the end of 2019. The future industrial park has 5 active residents.

In the Ural Federal District, it is planned to build an all-season multifunctional center, including the existing ski resort. The construction of the complex’s infrastructure requires more than 200 million rubles — for gas supply, water supply, sanitation and electricity. However, over the past year, the project for the ski complex has not been prepared. So far, there is only a business plan. Nevertheless, the project is not excluded from potential applicants for state support in the framework of the signed agreement with the “Monotowns Development Fund”.

It is planned to carry out reconstruction of the iron foundry in the Urals Federal District. It is planned to build a charge materials warehouse, a scrubber room, a modular compressor station, gas purification and a complete transformer substation.

In the Urals Federal District, the investor company plans to build a community and business center. The total area of the business center will be 45.5 thousand square meters. m, of which 18.1 thousand will occupy the apartment. Office areas will be located on the lower floors, residential areas above.

A Russo-Italian joint venture will launch plant manufacturing deep seabed oil & gas mining equipment in the industrial park in the Ural Federal Region. The Italian partners will share necessary technologies with Russians, all the processes will be set up by a Russian company.

In the Ural Federal District, the company is implementing a project to create the production of frozen ready-made meals. Now the production is located in a rented room. The new enterprise will create more than 120 jobs. Investments will amount to about 500 million rubles.

In the Urals, the implementation of a major investment project with the attraction of credit funds continues - “Construction of a duck meat production complex”. The design capacity of the enterprise will be 6.5 thousand tons of duck meat in slaughter weight per year, or 4.5 thousand tons of finished products.

The official opening of the second stage of the stone processing plant took place in the Ural Federal District. The total investment in the project amounted to RUB 50 million. The second phase of the plant will focus on the production of granite curbs.

In the Ural Federal District, the investor plans to build a plant for the production of modular gas piston power plants by the end of 2020. Estimated volume of investments - 202 million rubles.

The investor plans to build a block-modular power plant in the industrial park in the Ural Federal District, which will supply electricity and heat to residents under the energy service contract. The starting capacity of mini-TPPs will be 2 MW, in the future it can be increased to 25 MW.

An investor in the Central Federal District will launch a ceramic granite tile production line at his enterprise. This tile will differ from the already manufactured products with new parameters - color and dimensions.

The investor plans to launch a plant for the cultivation and processing of Clarium catfish in the territory of the former State District Power Plant in the Urals Federal District. The investor intends to use the site of the power plant to create a production of fish products in the amount of 10 thousand tons per year.

In the Ural Federal District, the investor decided to build a new dairy complex. It will be designed for 1100 milk places.

The investor is building a steelmaking complex on the basis of the former open-hearth workshop. The equipment is manufactured by an Italian company. The productivity of the new steelmaking complex will be 40 tons per hour, the average melting time is 60 minutes.

In the Ural Federal District, the investor company plans to build a data center (DPC) for the internal needs of the investor.

In 2019, the investor plans to invest more than $ 60 million in the reconstruction of a copper electrolyte plant in the Ural Federal District. Thanks to the reconstruction, the enterprise’s productivity will increase to 230 thousand tons of cathode copper.

The investor plans to build an electrolytic foil workshop in the Urals Federal District. The new workshop plans to produce copper foil with a thickness of 9 microns or more. These products are used for the production of electronic equipment, in particular smartphones and tablets. Commissioning will begin in the summer of 2019.

The investing company intends to build an abrasive materials factory in the Ural Federal District. They will be produced from industrial waste accumulated over the past decades. Opening of the plant will create at least 50 jobs in the city.